189
<br />Tuesday, August 7th. , 1928.
<br />7. T . 'Barnes E T. Tranber g Frame a Zim- er Hoban 3 Roach Bukowski
<br />j grading .60 .70 .70 .75 .60
<br />concrete 2.04 2.00 2,02 2.00 2,00
<br />marginal curb 35
<br />This being the date set, bids were received, opened and re ad for _the patfie
<br />went of the first alley east of 23rd., Otreet from Yishawaka Aven��e to :°Mall Street under.
<br />�'m
<br />t improveent Resolution No.2098. Bids are as follows:
<br />H' Barnes Hoban I Roach Frame �c Zimmer Bukowski E. T:". Tranberg
<br />gra ding .65 .80 .70 .60 .80
<br />floonerete 2.00 2.01 2.05 2.00 2.05
<br />m. curb .35
<br />This being the date set, bids wre received, opened and read for the
<br />pave, emt of the Ist. , alley north of. Corby " atre et from Nile s Avenue to Stanfield Street
<br />•
<br />und,r Improvement Resolution No.2099. Bids are as follows:
<br />AT. -Barnes Frame .3P Zimmer E. T. Tranberg Hoban ,? Road. Bukowski
<br />grading .65 .80 I.00 I.00 1.50
<br />iconcrete 2.00 2.05 2.I2 2.io 2.80
<br />a m. curb .35
<br />T:Y,'c�,.'"'G:{CT%k'IC;:)FT?YX7F'1`iCi't`7jC Jk'r*iC*TX.rG�:X?,C�C>;(?C?C:ti JK.`�JK!c J�f yff'%C:<?,k)fC.'1'xC?,CTk]ti�/,•`•.y,.S,CJtC J�C '��C ?,C%�%�
<br />This being the date set- bids were received, opened and read for the
<br />Lab '"ewer
<br />construction of the Johnson-Bergan bunk under Improvement Resol-ation No.2I08.
<br />Bids are as follows:
<br />R. Simeri N, Ind. Const. Ed. DiJulio J. Rothwell Reesh Sorenson Zjbmer
<br />I5 inch I.45 2.00 I.70 I.60 2.00 I.80
<br />12 inch I.40 I.80 I.40 I.40 I.50 I.60
<br />8 icnh .50 .50 .60 1.00 .80 I.00
<br />6 inch .60 .70 .65 .70 .70 I.00
<br />36 inch 7.50 6.45 8.00 8.50 .8.00 9.60
<br />manholes
<br />complete 3- 90.00 70.00 75.00 80.00 I00.00 90..00
<br />7- 85.00
<br />�cx�::L>:alc:?cvfc:F:x�:xxc�cje=k*=k*�cicxx��yc�=k��ickx��cXc**�=k**�c;k:?c*(c�:icIc�X�*��cY,e�cak�rak�c=K�ycxac*�v��(cyc��jck'kxc*�xa�cx�:k
<br />i
<br />All of the above bids handed to City Engineer for tabulation. {
<br />No petitions having been filed for a change to the type of other
<br />pavement
<br />than that specified in the preliminary order for the pavement ement on Chapin street from
<br />Calvert Jtreet to %wing Avenue under Improvement Resolution T�o.2079, the Board this
<br />i' 7th., day of August, I928, herebyx
<br />makes a final order for sheet asphalt heavy traffic pavement as the type of pavement
<br />with which said street hall be improved and awards the contract for said improvement
<br />#o Albert Construction ompany at their low bid of I4,227.2I.
<br />No petitions having been filed for a change in the type of pavement other
<br />than that specified in the preliminary order for the pavement of Nobth Shore Drive
<br />from point 150 feet west of the west line of Lafayette Street to the west line of
<br />Irquois Street under Improvement Resolution No.2076, the Board this 7th., day of August
<br />L . hereby makes a final order for sheet asphalt resurface heavy traffic as the type
<br />of pavement with which said street shall be improved and awards the contract for said
<br />improvement to Williston Construction Company at their low bid of 8,625.50. _.
<br />No nstttions having been filed for the pavement of Kendall street from the it
<br />alley north of 0„chard Street to Dunham street under Improvement Resolution No.2042,
<br />the Board this 7th. , day of August, I928, hereby -sakes a final order for sheet asphalt �
<br />light traffic pavement as the tyre of pavememt with which said street shall be improved
<br />and awards the contract for said improvement to Albert Cons t.,uction Company at their low
<br />bid of 2,612.85.
<br />No pei tions having be en fi 1 ed f or a change in the type of pavement other
<br />than that specified in the preliminary order for the pavement of Jefferson Street from
<br />17alnut Street to Sherry Street under Improvement Resolution IIo.204I, the Board this
<br />7th., day of August, I928, hereby makes a final order for sheet asphalt pavement light
<br />traffic as the type of pavement with which said street shad be improved and awards the
<br />contract for said improvement to Reith Riley Construction ompany at their low bid of I•
<br />5, 284.40.
<br />No petitions having been filed for the change of the type of -oavement_.other
<br />than that specified in the rreliminaxy order for the -p-avement of Yedison Street from
<br />Palmer Bbul"evard to Harriett Street under Improvement Resolution No.2083, the Board this
<br />7th., day of August, I928, hereby makes a final order for sheen asphalt heavy traffic
<br />pavement as the type of pavement with which said street shall be improved and awards
<br />the contract for said improvement to Reith Riley Construction Company at their low bid o
<br />!j 8,203.80 for sheet as shalt.
<br />
|