My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/07/1928 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1928
>
08/07/1928 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:02:42 PM
Creation date
12/20/2017 11:58:11 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/7/1928
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tuesday, August 7th. , 1928. <br />This being the date set, bids were received, opened and read for they' <br />pavement on Westmoor Street from Olive to Goodlend Avenue under Improvement Resolution <br />fTo.2094. Bids are as follows: <br />walk curb m. curb grading sheet asp. asp concrete s.1.I. reset J!, <br />Albert Co. 20 .50 .40 .702.45 2.35 12250 3.00 <br />"�a ter c onn.. 1. s. S. S. sewer Bonn. 8 " pipe <br />Albert Co. 29.00 22.00 .9.0-01 .90 <br />This being the date set, bids were received, opened and read for the, <br />paverpen.t on Kinyon Street from Portage `venue to the east line of Lot I8I Nortl4ffest <br />i Addition under Improvement resolution No.2I03. Bids are as follows <br />! <br />Albert Oo. "illiston Co. ' Reith Ailey C. T.I. Eldred H. ff. Barnes <br />rwalk .20 .25 .20 .20 .20 <br />� curb .50 .50 .50 /50 .45 <br />marginal curb .40 .40 .40 <br />comb curb&Gutter <br />grading .85 I.00 .95 .90 .80 • <br />sheet 2.46 2.50 2.47 <br />asp. concrete 2.36 2.40 2.40 <br />concrete r 2.40 2.50 2.30 <br />i storm water <br />inl ets 12.50 I2.50c 12.50 15.00 I2.50 <br />reset inlets <br />I and T%H. C. 3.00 3.00 3.00 3.00 3.00 <br />water c onn. 1. s. 29.00 28.50 27.50 30.00 28.00 <br />water con.n. s. s. 22.00 22.00 21.50 24.00 22.00 <br />sewer corn 1.50 . <br />I 8" pipe I.00 I.00 I.00 1.00 .90 <br />This being the da ue set, bids were .received, opened and read for <br />i, the pavement of 22nd., Street from Jefferson Blvd., to St. Joseph Bridge under Impro- <br />vement Resolution No.2064. Bids are as follows: <br />Albert Co. "illiston Co. rei.th Riley Co. C. Eldred <br />wa Uc .20 .20 .20 . I8 <br />curbma rginal .40 .40 .40 <br />i IT. H. C. PC. C. 80.00 75.00 90.00 80.00 <br />comb. curb <br />it gutter .75 .80 .90 .90 <br />grading .80 :75 I.00 .80 <br />li sheet asp. 2.67 2160 2.65 <br />+ asp. concrete 2.55 2.50 2.54 <br />stretcher block .50 .25 .50 .50 <br />concrete 2.40 2.50 2.50 <br />trees removed 6.50 5.00 8.00 5.00 <br />water conn.ext I0.00 I4.00 I3.00 I4.00 <br />I <br />curb inlets 18.50 20.00 I8.50 I5.50 <br />�! reset inlets <br />it and Y.H. 111. 3.00 3.00 3.00 3.00 <br />water-connl.s. 33.00 32.00 32.50 34.00 <br />water conn.s.s.22.50 25.00 27.50 24.00 <br />Ij sewer corm I.06 I.00 1.00 I.20 <br />i 81, pipe I.00 I.00 I.00 .95 <br />I2 T' pipe 1.65 I.75 I.60 2.I0 <br />15" pipe 2.20 2.00 2.00 2.20 <br />IO" pipe I.55 I.50 I.50 I.60 <br />This being the date set, bids were receive;., opened and read for <br />the r avement on the first alley north of LaSalle ` enue from Lafayette ''treet to the <br />first alley west of Lafayette Street under Improvement resolution 11o.2104. Bids are <br />i <br />as follows: <br />TH. TT. '?arnes Frame �- Zimr:er Hoban P Roach Alex Bnkowski • <br />grading h.-D I.00 I.00 2.00 <br />marg. curb .35 <br />concrete 2.00 2.I0 2.25 2080 <br />i1 <br />This beingthe date set, bids were received, opened and read for I' <br />the pavement of the alley vrest of Forest Avenue from Portage Avenue to a point 6.-4 feet <br />north of the north line of the first alley south of 'riverside give ender Improvement <br />+ Resolution 1do.209I. Bids are as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.