My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/17/1928 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1928
>
07/17/1928 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:58:34 AM
Creation date
12/20/2017 10:47:54 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/17/1928
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tuesday, July I7th. 1928. <br />Improvement Resolution No.2042. Bids are as fo11orrrs <br />filbert Co. Williston Co-. H. N. Barnes Alex Bukowski <br />Hoban & Roach <br />wal k .20 <br />.2'5 <br />.20 <br />I6 <br />020 <br />curb ,50 <br />.50 <br />.50 <br />40 <br />marginal curb .40 <br />.40 <br />30 <br />grading_ .95 <br />1.10 <br />60 <br />80 <br />I.00 <br />sheet asp. 2.48 <br />2.455 <br />asp. concrete 2.38 <br />2.45 <br />concrete <br />2.35 <br />2.00 <br />2.10 <br />2.30 <br />storm water inlets12.50 <br />12.50 <br />12.00 <br />10.00 <br />reset. inlets 3.00 <br />3.00 <br />3.00 <br />reset. m. h. c. 3.00 <br />3.00 <br />3.00, <br />water conn.l.s. 201W.00 0 <br />19.00 <br />22.00 <br />20.00 <br />water Conn. s. s.I5.00 <br />16.00 <br />20.00 <br />I5.00 <br />sewer Conn. I.50 <br />.90 <br />pipe I.00 <br />I.00 <br />.90 <br />1.00 <br />1.00 <br />y8"y. <br />This being the date set, <br />bids were received, <br />opened and <br />read for <br />pavement on North Shore <br />Street <br />Drive from A point <br />street, <br />I50 ft. , west of the <br />west line <br />,the <br />of Lafayette <br />to the west line <br />of Irquois <br />under Improvement <br />Resolution No..9076.. Bids <br />are as follows: <br />Albert Co. 4illiston Co. Reith -"iley <br />walk :20 .20 <br />curb .50 .50 <br />marginal curb .40 .40 <br />grading .95 I.00 <br />sheet resurfacing I.95 1.85 I.88 <br />asp. con.nTTTTTrTT I.83 I.75 <br />extra binder. I0.00 10.00 10.00 <br />storm water inlets I2.50 <br />reset. inlets 3.00 3.00 3.00 <br />reset. m. h. c. 3.00 3.00 3.00 <br />sewer Conn. 1.50 <br />8" pipe I.00 I.00 I.00 <br />Bids for the pavement on Jefferson under Improvement resolution N6.204II: <br />ALBERT CO. 7VILLI STON CO. R^ITH RILEY T. TRAnT3ERG -' HOBAN & ROACH H. BARNES <br />walk .20 .20 .20 .20 .20 " <br />curb .50 .50 .50 .50 .60 .50 <br />M. curb .40 .40 .40 .40 <br />grading I.00 I.I0 .90 .95 I.00 1.00 <br />sheet asp. 2.50 2.52 2.48 <br />asp. eonerete2.40 2.42 2.38 <br />concrete 2.35 2.40 2.40 2.30 <br />storm water <br />inlets 12.50 12.50 12.50 12.50 I0.00 I2.00 <br />reset inlets 3.00 3.00 3.00 3.00 3.00 3.00'' <br />reset m.h.c. 3.00 3.00 3.00 3.00 3.00 3.00 <br />water con.l.s. 29.00 28.00 29.00 30.00 30.00 28.00 <br />rt n n n. S.S. 22.00 22.00 21.00 24.00 25.00 21.00 <br />sewer Conn. 1.50 I.00 I' <br />8" pi -De I.00 I.00 I.00 I.00 I.00 I.00 <br />This being the date set, bids were received, opened and read for the <br />pavement of the alley west of Malin t5treet from Navarre street to Bartlett Street under <br />improvement resolution No.207I. Bids as follows: <br />Hoban Roach Snyder Co. H. Barnes E V. �'ranberg Frame Zimmer. <br />grading .75 .80 .80 .90 1.00 <br />C on cret e 2.00 2.15 2.18 2.25 <br />asp. concrete 2.I9 <br />kk>kkk�kkskk�=kkkk**7k7kkk>kK*k��e��ey!c�cjcicl;�e(c(c�***`k�ck�c*ye*!c?c�cxcklc3k�*x�c��pckx�����x��cfc��'��tj;��c�=f=*���sk�!. <br />This being the date set, bids were received, opened and read for the <br />pavement of Cherry, Arnold, Division Streets etc., under improvement . resolution No.2I07. <br />Bids are as follows: <br />SEA T•T MT PAGE. <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.