My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/03/1928 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1928
>
07/03/1928 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:55:44 AM
Creation date
12/20/2017 10:37:47 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/3/1928
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tuesday, July 3rd.9 1928. <br />• <br />• <br />:7 <br />.. • <br />• <br />Board met in regular session at 9 A. R W. R. Hinkle absent. <br />_ inutes of meetings held July 26th. , and June 27th. , 1928, read <br />and approved. <br />`.Curls being the date set, bids were received, opened and read for <br />the construction of the 65heridan Avenue Trunk Sewer under Improvement Resolution No. <br />2074. Bids are as follows: <br />i <br />Edward Di Julio Sorenson & Zomer J. J. Dunnegaan No. Ind. Cons1l. <br />6 inch pipe <br />I.00 <br />I.00 <br />1.00 <br />.90 <br />36 inch pipe <br />20.00 <br />I7.60 <br />I4.00 <br />8.25 <br />jl <br />Manholes complete <br />I00.00 <br />I00.00 <br />120.00 <br />90.00 <br />j <br />Class "A" Concrete <br />n5:'bd <br />16.00 <br />no bid <br />no <br />bid ii <br />Class "B" Concrete <br />n6'21bld <br />I2.00 <br />no bid <br />no <br />bid <br />Timber -in place <br />n60b1d <br />50.00 <br />no bid <br />no <br />bid j <br />Extra excavation <br />no bid <br />1.50 <br />no bid <br />no <br />bid` <br />Piling <br />no bid <br />I.50 <br />no bid <br />no <br />bid <br />This being the date set, bids were received, opened and read for <br />the pavement improvement in Lincoln Manor, Haley's Lincoln Highway Addition under <br />Improvement Resolution No.2092. Bids are as follows: <br />concrete walk <br />concrete curb <br />marginal curb <br />gra ding <br />sheet asp <br />storm water inlets <br />reset inlets <br />reset m. h. c. <br />water co nn. 1. s. 4011 <br />water coon. s. s. 40', <br />water c onn . 110 s. 3019 <br />water corn. s. s. 3019 <br />8 inch pipe <br />Storm water manholes <br />Williston Cons t. <br />.25 <br />.50 <br />.40 <br />.90 <br />2.47 <br />12.50 <br />3.00 <br />3.00 <br />38.00 <br />27.50 <br />28.50 <br />22.00 <br />I.00 <br />Co. Reith 'i ley L'o. <br />.20 <br />.50 <br />.40 <br />.88 . <br />2 .48 <br />T2.50 <br />3.00 <br />3.00 <br />37,00 <br />3I.00 <br />29.00 <br />22.50 <br />I.00 <br />Albert Uonst. Uo. <br />.20 <br />.50 <br />.40 <br />.70 <br />2.45 <br />I2.50. <br />3.00 <br />3.00 <br />39.00 <br />2900 <br />29.00 <br />21.00 <br />.90 <br />54.00 <br />This being the date set, bids were received, opened and read for <br />the pavement improvement on Napier titre et from Walnut Street to Cherry Street under <br />Improvement Resolution No.2044. Bids are as follows: <br />concrete walk <br />concrete eurb <br />marginal cutb <br />grading <br />sheet asphalt <br />asp. concrete <br />concrete <br />storm=later inlets <br />reset inlets <br />reset m. '7. c. <br />water Bonn. 1. s. <br />water corn. s. s. <br />8 inch pipe <br />sewer coon. <br />Re ith Riley <br />.20 <br />.50 <br />.40 <br />.90 <br />2.48 <br />2.38 <br />12.50 <br />3.00 <br />3.00 <br />37.00 <br />3I.00 <br />I.00 <br />xx±xxx <br />Albert Go. <br />.20 <br />-.50 <br />.40 <br />I. 00 <br />2.49 <br />2.39 <br />12.50 <br />3.00 <br />3.00 <br />39.00 <br />29.00 <br />I.00 <br />1.50 <br />Williston Co. <br />.50 <br />.40 <br />1.00 <br />2.52 <br />2.43 <br />2.20 <br />12.50 <br />3.00 <br />3.00 <br />34.00 <br />25.00 <br />I.00 <br />Alex Bukowski <br />.I6 <br />.40 <br />.30 <br />70 <br />2.35 <br />12.00 <br />2.50 <br />3.00 <br />35.00 <br />25.00 <br />I.00 <br />C. H. Ei dred <br />.20 <br />.50 <br />1.30 <br />2.37 <br />15.00 <br />3.50 <br />3.50 <br />30.00 <br />26.00 <br />1.00 <br />1.50 <br />This being the date set, bids were received, opened and read for <br />the_ pavement improvement of the nortI one-half of Oakwood Blvd. , from Portage Avenue <br />to the-pavement <br />Place under Improvement esolution No.2077. Bids are as follows: <br />dilliston construction "o. , <br />Varginal curb <br />.40 <br />combined curb and gutter <br />I.00 <br />gra di ng <br />.90 <br />sheet asphalt <br />2.48 <br />storm water inlets <br />20.00 <br />water corn. 1. s. <br />29.50 <br />8 inch pipe <br />I.00 <br />All of the above bids handed to 0ity tgineer, H. G. Wray, for <br />, <br />tabulation. <br />No petitions having been' filed. for a charge of the type of pave <br />' other than that specified in the preliminary _order for the pavement of Pulaski 6treet <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.