My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/15/1928 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1928
>
05/15/1928 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:46:07 AM
Creation date
12/19/2017 2:41:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/15/1928
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F76 <br />Tue s clay , <br />11 y 1`5 t h. , 1928. <br />�I <br />77. <br />Z. Nees Co. <br />C. A. ,131dred <br />i <br />walk <br />. 20 <br />.2 0 <br />curb <br />50 <br />.50. <br />i <br />curb and gutter <br />/40 <br />.85 <br />grading <br />.00 <br />I <br />concrete L.T. <br />2.35 <br />2.30 <br />'i <br />storm water inlets 18.00 <br />12.50, <br />reset. inlets. <br />3.00 <br />3.00 <br />reset. m.h.c. <br />3.00 <br />3.00 <br />( <br />3/4 'T water Conn Long <br />45.00 <br />no bid <br />3/4" water Conn.short <br />32.00 <br />no bid <br />sewer Conn. <br />I,.30 <br />I.00 <br />8 inch pipe <br />.95 <br />1.00 <br />water eonn* s. s. <br />60.00 <br />36,00 <br />water eonn. 1. s. <br />80.00 <br />26.00 <br />This'being the date set, bids were received, opened and read <br />for the pavement of the alley north of Marion Street from west line of alley west <br />of FVIiehigan Street to Michigan Street under Improvement Resolution Lo.2040. Bids <br />are as follows: <br />Harry Barnes E. <br />T. Tranberg <br />Carl Zimmer- <br />grading <br />I.00 <br />I.00 <br />I.OQ <br />cancrete <br />2.30 <br />2.22 <br />2.20 <br />i <br />This being the date set, <br />bids were <br />received, <br />opened and <br />read <br />for the pavement <br />of the alleys in Belkeville <br />Ist. , -Unit under Improvement Resolution <br />No.2055. Bids, are as follows: <br />Standard Co. C. H. Eldred <br />Carl Zimmer <br />Tranberg <br />H. Barnes <br />Williston <br />grading <br />.75 .90 <br />.80 <br />.72 <br />.60 <br />,75 <br />concrete <br />1.90 2.10 <br />2.08 <br />2.10_ <br />2.15 <br />1.95 <br />storm water in. <br />12.00 15.00 <br />12.50 <br />12.00 <br />12.00 <br />1.250 <br />8 " pipe <br />.80 1.00 <br />I.00 <br />.90 <br />1 `00 <br />I..00 <br />This being the date set, bids were received, opened and read <br />for the local sewer in Qxieen Street under improvement Resolution 1,1o.2048. . Bids <br />as follows: <br />R Simeri <br />John Lugaresi. <br />Edw. Di Julio <br />I2 inch pipe <br />I.60 <br />1.60 <br />1.50 <br />6 inch pipe <br />.70 <br />.55 <br />.60 <br />8 inch pipe <br />.50 <br />Aanholes complete <br />70.00 <br />75.00 <br />65.00 <br />This being <br />t1i=- date set, bids <br />were received, opened and read <br />for the local sewer <br />in King Street <br />under Improvement <br />-Resolution No.2047. BIAS are <br />as follows: <br />R. Simeri Edw. Di Julio <br />12 inch pip a 1.65 I.55 <br />f!, 6 inch pipe 180 .60 <br />8 inch pipe .50 <br />manholes complete 70.00 65.00 <br />City Engineer, H. G. Wray, submitted partial estimate Ho.I forth <br />j the pipe sewer improvement in Adams Street between Vassar and Humbolt "street, in ace- <br />ordance with the terms of the contract between the City and John F. Hipskind, contract- <br />or, under Improvement Resolution Ho.2026. The Board signed and approved same in the <br />! amount of 1,084.07. <br />3 <br />City Engineer, H. G. Wray, submitted partial -estimate Ho.I <br />for the light traffic concrete pavement of the alley west of Cottage Grove Avenue <br />�! from Fuerbringer Street to allW north of Fuerbringer Street, in accordance with <br />the terms of the contract between the City and E. T. Tranberg, contractor, under <br />Improvement Resolution No.I990. The Board signed and approved same in the amount of <br />$750.65. <br />Upon the recommends. Lion of Wm. F. ;Qualls, the j Board approved the installation of. a 400Q lumen light at the intersection of 26tn.,. treet and <br />Jefferson Blvd. , at a cost of 45.00 per year.. <br />i <br />li Bids, having been received f or the construction of _ pavement <br />on the alley west of Sherman Avenue from Oak Street to Lincoln 111day West under <br />Improvement Resolution No.2015. the Board this I5th. , day of May, 1928, hereby awards <br />the contract for said improvement to E. T. Tranberg at his low bid of $2,490.60 for <br />light traffic, concrete pavement. <br />• <br />0 <br />• <br />• <br />is, <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.