Laserfiche WebLink
2. REPLACE, Section XII.B.10 <br />10. The demolition work, including clearing and grubbing, asbestos abatement, <br />complete demolition of structures, backfilling, and grading, for all divisions shall have a <br />completion date of March 30, 2018. Contractors shall complete seeding of the sites by <br />April 27, 2018. <br />3. REPLACE, Section XX.B.1 <br />1. The Work of this project is offered in three (3) Divisions: Division A, Division B, and <br />Division C. <br />a. Division A: 11 Houses, A-01, 02, 03, 04, 05, 07, 08, 09, 10, 11, 12 <br />b. Division B: 9 Houses, B-01, 02, 03, 05, 06, 07, 09, 10, 11 <br />C. Division C: 8 Houses, C-02, 03, 04, 05, 06, 08, 09, 11 <br />4. REPLACE the section numbers for the following section titles with those listed below. <br />XXI. SAFETY AND SITE SECURITY <br />XXII. TEMPORARY EROSION CONTROL <br />XXIII. ASBESTOS ABATEMENT <br />XXIV. DEMOLITION AND CLEARING <br />XXV. CONCRETE APPROACH, SIDEWALK, AND CURB REMOVAL <br />XXVI. TOPSOIL AND MULCHED WHITE DUTCH SEEDING <br />III. Bid/Proposal <br />7. REPLACE Bid/Proposal form with the attached revision. <br />Attachments: <br />Revised Bid Form (4 pages) <br />Pre -Bid Agenda (2 pages) <br />Pre -Bid Sign In Sheet (I page) <br />-This addendum consists of a total 10 pages inclusive of "Acknowledgement of Receipt of <br />Addendum" sheet- <br />