My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2017 Demolitions Phase 2 Project No 117-121 - Green Demolition Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - 2017 Demolitions Phase 2 Project No 117-121 - Green Demolition Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 8:34:22 AM
Creation date
12/13/2017 2:56:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1316 COUNTY -CITY BuILDINO <br />227 W. JEFFERSON BOULEVARD <br />SOUTH BEND, INDIANA 46601-1830 <br />Date: December 6, 2017 <br />To: All Planholders <br />PHONE 574/235-9251 <br />FAX 574/ 235-9171 <br />TDD 5741235-5567 <br />CITY OF SOUTH BEND PETS BUTTIGIEo, MAYOR <br />BOARD OF PUBLIC WORKS <br />2017 Demolitions, Phase 2 <br />117-121 <br />Addendum No. I <br />From: Roger T. Nawrot, PE & PLS, Assistant City Engineer <br />I. Summary of Revisions <br />1. Three houses have been removed from the bid. <br />a. A-06 —1523 Elwood Avenue <br />b. C-07 — 1614 Kendall Street <br />c. C-10 — 225 E Calvert Street <br />2. The completion date for all Divisions has been changed to March 30, 2018 for all work <br />excepting seeding. Contractors will have until April 27, 2018 to complete seeding work <br />for all Divisions. <br />3. Certificate of Appropriateness has been obtained from the Historical Preservation <br />Commission for 805 Leland Avenue (A-12). <br />The following information is to be changed/added to the contract documents: <br />H. Special Provisions <br />1. REPLACE, Section XII.B.6 <br />6. Contractor may commence demolition work at more than one demolition site, <br />provided that Contractor performs Work continuously on each site. Clearing and <br />grubbing of sites may begin in advance of demolition, if desired, provided organic <br />and inorganic debris is promptly removed from the site or fenced as a hazard. Once <br />demolition of a structure commences on a site, progress shall be continuous through <br />removal of all debris. Inspections of the completed demolition sites and Department <br />of Public Works approval is required before Contractor proceeds to the next property <br />or properties to be demolished. There will be no relief of this schedule if the same <br />Contractor is awarded contracts for more than one Division of this project, or other <br />separate contracts for work under the City's Vacant and Abandoned Housing <br />Initiative. Multiple contracts to the same Contractor must be performed <br />simultaneously, not consecutively. <br />
The URL can be used to link to this page
Your browser does not support the video tag.