Laserfiche WebLink
083 <br />■ <br />The Board next gave consideration to the improvement of LaSalle Avenue, from Hill <br />Street to Eddy Street, and Bartlett Street, from Michigan Street to Riverside Drive, <br />land directed that Rieth-Riley Construction Company, Inc., be notified to proceed with <br />the laying of Type."C" Hot -Mixed, Hot -Laid, Asphaltic Concrete on these two°streets, <br />Ion accord 'with. contract.. of August 22, 1955. <br />1TRAFFIC ENGINEER: <br />Traffic Engineer, E. H. Miller, being present, the Board entered into a 4iscussion <br />• of the continued use of Clive Street by heavy truck traffic, and what steps might be <br />taken to reduce and control such traffic. Petition, dated August 31, 1955, bearing <br />!eighty signatures, in this matter, was examined by the Board. The City Attorney re- <br />liferred to and read the statutes applying thereto; Acts of 1931, Chapter 83, Section 11, <br />hand Acts of 1939s Chapter 48, Section 156. After a considerable period of discussion, <br />!!the Board authorized and directed the Traffic Engineer to obtain proposals from im- <br />1partial testing firms to run tests and determine the load -bearing capabilities of Olive <br />I: <br />iStreet from Sample Street to Lincolnway Nest. From the results of such tests, the <br />;,Board will be enabled to establish specific limitations on size of trucks, weights of <br />`loads etc, and provide routing for truck traffic banned from using Olive Street. <br />I � � p g _ g <br />The'time now being 10:00 A. M. C.S.T., it was so announced and the Board proceeded <br />• 1with the opening of bidst <br />• <br />• <br />DELANO AVENUE - VICTORY AVENUE RESOLUTION NO.2815 <br />REED CONSTRUCTION CO., A non -collusion affidavit <br />202_1,T- N. Main St. and bidder's bond accompanied <br />MISHAWAKA.. INDIANA. the bid. <br />TOTAL EXTENSION OF ITEMS 1-3, 2-3, 2, 31 4, 5, 6, & 7 ...•` 5s802o6o <br />Completion date on or before November 1, 1955. <br />RIETH-RILEY CONSTRUCTION CO., A"non-collusion affidavit <br />SOUTH BEND,-INDIANA. and bidder's bond accompanied <br />the bid. <br />TOTAL EXTENSION OF ITEMS 1-3, 2-3, 2, 3, 4, 5, 6, & 7.0.. 26..872.55 <br />Completion date on or before :December 1, 1955. <br />MOVING HOUSES AND'BUILDING FOUNDATIONS ETC. <br />UNDER CONTRACT "B".1954 Gen. St. Improv. Program. <br />MITSCHELEN CONSTRUCTION CO. A non -collusion affidavit <br />3420-S. MICHIGAN STREET and bidder's bond accompanied <br />SOUTH BEND, INDIANA the bid. <br />TOTALBID PRICE ................... ...................... $38,996.50 <br />Completion date - 60 calendar days after award is made. <br />WORDEN BROS. A non -collusion affidavit <br />1014 N.-OLIVE STREET and bidder's bond accompanied <br />SOUTH.BEND, INDIANA. the bid. <br />TOTALBID PRICE........................................E+5,283.10 <br />Completion date - 120 calendar days after award is made. <br />The foregoing bids were referred to the engineers for tabul&tion and report. <br />ii The Board next examined and approved plans and specifications for the improvement <br />,;of SAMPLE STREET from Falcon Street to Kentucky Street, designated as Contract No. 2. <br />The Board examined and approved plans and specifications for the improvement on. <br />!'Eddy Street, from Madison Street to Sorin Street, designated as Contract No. 3 <br />TRAFFIC ENGINEER: <br />i. <br />The Traffic Engineer's need for eight one-way two -section traffic signal heads <br />!iwas then considered by the Board, and the Clerk authorized to proceed with the purchase <br />Hof this equipment. <br />The Board approved installation of a YIELD RIGHT OF WAY sign on the southwest <br />y corner of Sherwood Avenue at Fellows Street.-_ <br />i <br />Contractor's bonds, each in the sum of $1,000.00, were examined and approved for <br />;Adams Roofing and Construction Company and Russell Rose, 'Sr. <br />There being no further business to come before the Board, the meeting was adjourned. <br />at 11:30 A. M. <br />;Attest: <br />�F THE BOARD OF POEt10 V:`�.�: <br />