My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/15/1955 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1955
>
08/15/1955 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 9:45:52 AM
Creation date
12/5/2017 12:41:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/15/1955
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 0 7 <br />U <br />;Reed Construction Co. bid continued - <br />Pavement Surface Material, etc......................$64,750.00 <br />Cement pavement removal, asphalt pavement removal <br />Manhole covers reset etc ........................... 1,482.50 <br />The Rieth-Riley Construction Company having submitted the lowest and best bid <br />.for 5,000 Tons Asphaltic Concrete, the Board directed that contract be entered into <br />accordingly. <br />It was the consensus of opinion of the Board that Reed Construction Companyts bid <br />for the resurfacing of Notre Dame Avenue from Sorin Street north to the City Limits, <br />was the lowest and best bid and the Board awarded contract accordingly. <br />The Traffic Engineert s department having urgent need for fifty 30" x 301t sign faces <br />it a total cost of $265.00, the Board approved the purchase and authorized the release <br />>f Purchase Order BZN8257. <br />The Traffic EnggineerIs department having urgent need for 200 ten -foot U-Posts <br />at a total cost of $Ll 8.00,-the Board authorized the Clerk to proceed with the purchase. <br />Maintenance Bond, in the sum of $1?73.00.for Axel E. Anderson was examined and <br />approved by the Board. <br />Excavation Bond in the sum of $1,000.00, was examined and approved for Geo. E. <br />�ibley, d/b/a Geo. E. Sibley Company. <br />Contractorts Bonds, each in the SUM of $1,000.00, were examined and approved by <br />R. E. Bigler, d/b/a Bigler Construction Co., and Eugene Guzicki. <br />The Board approved the installation of S-T-O-P signs on Humboldt at Eclipse, <br />• ;;which signs have been reversed. <br />i <br />There being no further business to come before the Board, the meeting was adjourned', <br />at 11.;5 A. M. <br />L�2e - �11 <br />,!Attest; 07 <br />Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.