My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Discharge Permit - St Joseph Energy Center and Water Treatment Facility
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Licenses and Permits
>
Industrial Discharge Permit - St Joseph Energy Center and Water Treatment Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 3:17:51 PM
Creation date
11/30/2017 9:08:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
11/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FYI ... The .Water Treatment Facility's permit includes the following requirements found within the <br />discharge permit, <br />1) The Water Treatment Facility shall report flow daily. <br />2) Only the Authorized Representative shall be required to sign the certification statements found in Part III <br />(A) (4) of this permit. <br />3) The Water Treatment Facility's Authorized Representative shall sign with the certification statement (found <br />in Part III (A) (4)) all reports including but not limited to Periodic Compliance Reports (PCR), Slug Control <br />Plans, Flow Measurement Plans, corrective actions in response to permit violations, and any <br />correspondence relating to compliance with this industrial discharge permit. <br />4) The Water Treatment Facility shall, within 90 days of receipt of this discharge permit, submit a Slug Control <br />Plan and a Flow Measurement Plan with the certification statement signed by an Authorized Representative. <br />Please see Part III (E) and (H). <br />5) When collecting composite samples, samples must be obtained over a 24 hour period or for the duration of <br />discharge within the 24 hour sampling period including, if applicable, multiple batches. <br />6) Samples shall be obtained through a flow -proportional sampling technique. If The Water Treatment <br />Facility can demonstrate that time -proportional sampling is as representative as flow -proportional <br />sampling, then a time -proportional sample may be collected. If The Water Treatment Facility chooses to <br />demonstrate that time -proportional sampling is accurate they must do so within 120 days of the effective <br />date.of this permit or they shall commence flow -proportional sampling at that time. Please see Part II (B) <br />(1) of your wastewater discharge permit for details. <br />7) The Water Treatment Facility shall have a Certified Operator for the State of Indiana sign all compliance <br />reports including, but not limited to PCR's, Corrective Action responses related to effluent limits <br />violations .... See Pert III (F) (1). <br />8) To be submitted with the PCR, the Certified Operator shall sign one of the following statements: <br />"Pretreatment Standards and Requirements are being met on a consistent basis" or "Pretreatment Standards <br />and Requirements are not being met on a consistent basis. Additional operation and/or additional <br />pretreatment is required to meet the Pretreatment Standards and Requirements". Please see PART III (A) <br />(3) (a). <br />9) Please review Section Part IV (B) (15), which clarifies the requirements concerning the . Authorized <br />Representative. <br />10) For all after hours required oral notifications call: 574-277-8515 and dial zero (0) to reach an operator. See <br />Part 111(I) of your permit for details. <br />Water Treatment Facility Industrial Discharge Permit Page 1 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.