Laserfiche WebLink
FYI... St. Joseph Energy Center's permit includes the following requirements found within the <br />discharge permit. <br />1) St. Joseph Energy Center shall report flow daily. <br />2) Only the Authorized Representative shall be required to sign the certification statements found in <br />Part III (A) (4) of this permit. <br />3) St. Joseph Energy Center's Authorized Representative shall sign with the certification statement <br />(found in Part III (A) (4)) all reports including but not limited to Periodic Compliance Reports <br />(PCR), Slug Control Plans, Flow Measurement Plans, corrective actions in response to permit <br />violations, and any correspondence relating to compliance with this industrial discharge permit. <br />4) St. Joseph Energy Center shall, within 90 days of receipt of this discharge permit, submit a Slug <br />Control Plan and a Flow Measurement Plan with the certification statement signed by an <br />Authorized Representative. Please see Part III (E) and (H). <br />5) When collecting composite samples, samples must be obtained over a 24 hour period or for the <br />duration of discharge within the 24 hour sampling period including, if applicable, multiple batches. <br />6) Samples shall be obtained through a flow -proportional sampling technique. If St. Joseph Energy <br />Center can demonstrate that time -proportional sampling is as representative as flow -proportional <br />sampling, then a time -proportional sample may be collected. If St. Joseph Energy Center chooses <br />to demonstrate that time -proportional sampling is accurate they must do so within 120 days of the <br />effective date of this permit or they shall commence flow -proportional sampling at that time. <br />Please see Part 11(B) (1) of your wastewater discharge permit for details. <br />7) St. Joseph Energy Center shall have a Certified Operator for the State of Indiana sign all <br />compliance reports including, but not limited to PCR's, Corrective Action responses related to <br />effluent limits violations.... See Part III (F) (1). <br />8) To be submitted with the PCR, the Certified Operator shall sign one of the following statements: <br />"Pretreatment Standards and Requirements are being met on a consistent basis" or "Pretreatment <br />Standards and Requirements are not being met on a consistent basis. Additional operation and/or <br />additional pretreatment is required to meet the Pretreatment Standards and Requirements". Please <br />see PART III (A) (3) (a). <br />9) Please review Section Part IV (B) (15), which clarifies the requirements concerning the Authorized <br />Representative. <br />10) For all after hours required oral notifications call: 574-277-8515 and dial zero (0) to reach an <br />operator. See Part III (I) of your permit for details. <br />If you have any questions, feel free to contact Manuel "Manny" Bueno at (574) - 235-5798 or <br />mbueno@southbendin.gov or Lauren Trapp at (574) 235-5852 or ltrapp@southbendin.gov. <br />St. Joseph Energy Center Industrial Wastewater Discharge Permit Page I of 43 <br />