195
<br />July 12, 1954
<br />A regular meeting of the Board"of Public Works was held Monday, July 12, 1954, at
<br />,10:00 A. M. All members were present. Minutes of the previous meeting were read and
<br />approved. Claims of the following suppliers, in the total amount of $47,306.80, were
<br />approved and ordered paid:
<br />Business Systems, Inc. $8.10 Ernest DeGraff :45.52
<br />Gafill Oil Co. 44.00 John W. Gorney 5.00
<br />Inlander-Steindler Paper Co. 26.32 Indiana State Industries 12.41
<br />Indiana Bell Telephone Co. 9.60 Indiana Lumber & Mfg. Co. 16.50
<br />Elmer E. Murray 48.96 G. A. Perry Enterprises 6.00
<br />South Bend Electric Co. 77.11 Walter Stickley 32.32
<br />Dale E. Shelly 91.20 United States Steel Supply 93.50
<br />J. W. Werntz & Son 3.39
<br />PARKING N1,1 TER:
<br />M. H. Rhodes, Inc. 48.00 A. E. Constant 41.50
<br />C. A. Szynski 15.44 C. E. Burkett 15.36
<br />SEWAGE WORKS CONSTRUCTION:
<br />Consoer, Townsend & Assoc. 2149.73 Consoer, Townsend & Associates 4416.90
<br />. Treasurer State of Indiana 40,000.00
<br />S TREE T & TRAFFIC:
<br />Belleville Lbr. & Supply Co. 6.93 Kuert Concrete, Inc. 34.05
<br />Indiana Textile Co. 39.06 Coffield Supply Co. 3.16
<br />Kuert Concrete, Inc. 16.80
<br />The first business given the attention of the Board was that of the conveying to
<br />Ernest L. Longwa.y and Eva L. Longway, for the consideration of $2900.00, the following
<br />...described real estate:
<br />Lot Numbered 7 and a lot or parcel of land 28 feet in
<br />width, North and South, taken off of the entire South
<br />• side of Lot Numbered 6, as shown on the recorded Plat
<br />of Coquillard Woods Addition (Section "A") to the City
<br />of South Bend, St. Joseph County, Indiana.
<br />Warranty Deed was, accordingly, signed and notarized, and all papers pertaining to
<br />the City's title were delivered to the City Attorney, for the consummation of the con-
<br />veying of title.
<br />A letter from Rev. C. J. Witucki, seeking permission for the barricading of streets,
<br />at night only during festival operations, throughout the dates of July 18th to 25th
<br />inclusive, and for the conducting of the Saint Casimir Church Annual Festival on those
<br />dates insofar as the public streets are involved, was read and considered by the Board.
<br />It is understood that Saint Casimir Church will provide public liability insurance to
<br />• protect the parish and the City of South Bend, as heretofore provided for this annual
<br />aff air. The Board granted authorization and directed the Clerk to so notify Rev. Witucki::
<br />The Taxicab License Affidavit of John L. Detzler was next given the Boardts con-
<br />sideration. The Board set the hearing in this matter for I:Ionday, July 26, 1954, at
<br />11:00 A. M. D.S.T. and ordered notice of hearing to be published in the South Bend Tribune,
<br />Friday, July 16th. i.
<br />The Mayor having ordered the repair of the sidewalk and curb immediately in front of
<br />the City Hall, and a -. satisfactory quotation for the prompt installation of this urgently
<br />needed improvement having been submitted for the Board's consideration, the Clerk was
<br />. directed to proceed at once to accept the quotation and order the work to be done.
<br />The Board read and concurred fully with letter written to the Executive Vice President
<br />of the University of Notre Dame under date of July 9, 1954, over the signature of the
<br />Chairman of the Board which reads as follows:
<br />"This letter is pursuant to our several meetings with you and your
<br />Attorney, 1;r. Louis Chapleau, in regard to an agreement of charges to
<br />be made to the University for treating the University's sewage at our
<br />Sep^✓age Treatment Plant located at Pin 1-1ook Park in South Bend, Indiana.
<br />The University will furnish to the City a quarterly average adjusted
<br />count, that is, a population count will be due on each
<br />•population
<br />January 15th, April 15th, July 15th, and October 15th of each year.
<br />The City Sewage charge billing clerk will use the national institutional
<br />water usage average of 80 gallons per capita per day multiplied by the
<br />population count furnished by the University of Notre Dame to arrive at
<br />a. total quarterly sewage volume. From this calculated volume a charge
<br />based on the O dinancets established rate ,will be levied for such sewage
<br />treatment.
<br />Billingwill start the _month after the City of South Bend puts its Sewage
<br />Treatment Plant into operation, provided however, that at such. time the
<br />•
<br />University sewers have been connected to the City's interceptor sewer system."
<br />The delay in the repair of the Ironwood Drive Bridge next came to the attention of
<br />the Board, and the Clerk was directed to notify Engineer Wm. S. Moore that his proposal
<br />:I
<br />
|