My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - DLZ Indiana LLC - Design and Right of Way for Tucker Drive
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Agreement - DLZ Indiana LLC - Design and Right of Way for Tucker Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 8:45:03 AM
Creation date
11/16/2017 11:16:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a) Cover Sheet and Index Sheet, <br />b) Typical Cross Sections, <br />c) Maintenance of Traffic Plans, <br />d) Plan and Profile Sheet(s), <br />e) Pavement Marking Plans, <br />0 Hydraulic Analysis and Drainage Details, <br />g) Quantity calculations and a probable construction cost, <br />h) Specifications and bid package. <br />2. Prepare and submit to client, final Design Plans, Specifications, Final <br />Statement of Probable Construction Cost and Final Contract Bidding <br />Documents for the Project. Hard copy and electronic copies of the <br />documents shall be provided in the required format. <br />3, Final plans shall include these sheet(s): Cover sheet, Typical Sections, <br />Maintenance of Traffic, Plan and Profile Sheet(s), Structure Data Table (if <br />applicable), Detail Sheet, Miscellaneous Tables, Pavement Marking and <br />Signing sheet, and Grading Plans. <br />C. Utility Coordination <br />1. The Engineer shall perform utility coordination services to notify all affected <br />utilities of this project and determine if they are in conflict with this project. <br />If they are in conflict, the Engineer shall request utility work plans from the <br />Utility for the relocation of their facilities. <br />D. Right of Way Services <br />1, The Engineer shall perform a Title search for the following parcels: <br />a. Steel Warehouse — 71-08-15-126-007.000-026, <br />b. Raitt Corporation — 71-08-15-176-003.000-026, <br />c. Research existing right of way along Tucker Drive. <br />d. The Engineer shall manage the property acquisition, to secure one 1 <br />parcel required. This parcel will be donated without offer and no <br />appraisal will be required. No lien or encumbrance releases shall be <br />obtained. <br />A1.02 BIDDING OR NEGOTIATION PHASE <br />A. After acceptance by the owner of the bidding documents described in paragraph <br />A1.01.A.2, and upon written authorization by the owner to proceed, engineer shall: <br />Exhibit A, Engineer's Services <br />EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright 02009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.