Laserfiche WebLink
A. Prevailing Specifications: <br />1. Contractor must be licensed contractor with work completed by licensed plumber. <br />B, Project Scope: <br />1. Materials and installation of new meter pit and meter per code and Water Works requirements and <br />in location specified on the plan. <br />C. Equipment specifications <br />1. All equipment will satisfy current local and state code. <br />2. Meter pit will include cover and ring. <br />3. Meter will be 1" with associated rams horn. <br />D. Installation considerations: <br />1. Care will be taken by the contractor not to disturb existing plants in the Rose Garden. <br />2. Connection will be made to existing water line located adjacent to garden. <br />3. Areas disturbed by project will be levelled and seeded for grass. <br />A. Final location of pit will be verified on site with winning bidder prior to installation, <br />