My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Market Agreement - Installation of Leeper Park Meter Pit - WISSCO Irrigation Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Open Market Agreement - Installation of Leeper Park Meter Pit - WISSCO Irrigation Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 8:27:26 AM
Creation date
11/16/2017 10:17:37 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. Prevailing Specifications: None <br />B. Additions: <br />1. The Contractor shall verify the locations of all utilities by contacting Holey Moley at 1-800-352-5544 <br />at least two (2) working days, not counting Saturdays, Sundays or federal and state holidays before <br />proceeding with construction. It shall also be the Contractors responsibility to contact any other <br />utility that is not contacted by Holey Moley and verify the utility locations. <br />2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone, <br />etc. in order to assure that all utilities that need to be replaced or relocated can be done with a <br />minimum disturbance to service. The Contractor shall also be responsible for coordinating <br />schedules with the various utilities such that they can proceed with their relocation work as <br />efficiently as possible. <br />3. If the odor of natural gas is detected in a work area at any time during the course of work, the <br />Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also <br />immediately notify the residents of adjacent properties. The Contractor shall advise the residents <br />to evacuate their homes immediately if the odor is present within the dwelling. <br />4. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the <br />Contractor at no additional cost to the City or the Owner of the system. <br />XVII, MAINTENANCE OF TRAFFIC <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Sections 105 & 801 <br />B. Additions: <br />1. Maintenance of traffic during construction shall conform to the "Indiana Manual on Uniform Traffic <br />Control Devices" and the City of South send Design and Construction Standards. <br />2. The attached "Traffic Closure Request" form is to be used for any lane restrictions or closures and <br />required to be filled out and sent to the Department of Public Works <br />3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner <br />that traffic on existing streets is unrestricted throughout the Project. The Engineer shall approve <br />the method of traffic control. No construction equipment, vehicles, materials, supplies or temporary <br />facilities shall be left unattended in the right-of-way of any street or left parked overnight without <br />proper marking and lighting. <br />4. After the award of the contract and before beginning the work, the Contractor shall submit his <br />proposed schedule of operations for the review of the Engineer. The schedule of operations as <br />reviewed by the Engineer shall be maintained at all times. <br />5. There will be no direct payment for this work. <br />XVIII. DESCRIPTION OF WORK <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Work to be performed shall include furnishing all labor, services, materials, insurance and install <br />a meter pit and meter at Leeper Park per the specifications as defined in the specifications. <br />2. The Base Bid covers all prep, materials, and labor to install a meter pit and meter at Leeper Park <br />per the specifications per the intent of the Plans and Specifications. <br />3. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor's operations. <br />XIX. PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />1. The plans consist of 2 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br />XIX. SPECIFICATIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.