Laserfiche WebLink
C. <br />e. <br />appurtenances including valves and hydrants. The project includes a jack <br />and bore installation of 12-inch carrier pipe with 24-inch steel casing for the <br />crossing of US-31. It also includes a creep crossing along SR-23 and <br />pavement replacement of SR-23 as required for the installation of the water <br />main. Connection to an existing water main along SR-23 and at the Four <br />Winds Casino is also included. See Attachment 1 for a schematic of the <br />proposed improvements (Option 1). The detailed scope of services is <br />included in Attachment 2 in addition to those identified in Exhibit A <br />(Engineer's Services) of the original agreement. <br />The responsibilities of Owner are modified as follows: <br />There are no modifications to the responsibilities of the Owner as set forth in <br />the Original Agreement. <br />For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br />Following are the proposed fees for this Amendment for completing the scope <br />of services included in Attachment 2 as well as those included in the original <br />agreement. Compensation for the Preliminary Design Phase, Final Design <br />Phase, Bidding and Negotiating Phase, and Construction Phase services shall <br />be paid in accordance with Exhibit C, Article C2.01. Compensation for the <br />Additional Services shall be paid in accordance with Exhibit C, Article <br />C2.02. <br />Preliminary Design Phase (Lump Sum) <br />$79,000 <br />Final Design Phase (Lump Sum) <br />$409000 <br />Bidding and Negotiating Phase (Lump Sum) <br />$9,500 <br />Construction Phase (Hourly NTE) <br />$30,000 <br />Additional Services (Easements — Hourly NTE) <br />$19,500 <br />Amendment No. 1 Total: <br />$178,000 <br />The schedule for rendering services is modified as follows: <br />The period of service indicated in Exhibit C, Article C2A1.B shall be <br />modified to a period not exceeding 18 months. The anticipated schedule for <br />the phases identified in Exhibit A, Part 1 — Basic Services is provided below. <br />Preliminary Design Phase: 120 days <br />Final Design Phase: 60 days <br />Bidding Phase: 60 days <br />Construction Eng. Phase: Duration of Construction (Est. 210 days) <br />Page 2 <br />(Exhibit K— (Amendment No. One to Owner -Engineer Agreement) — Attachment I) <br />EJCDC E-500 Agreement Bchveen Owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved, <br />