Laserfiche WebLink
This is EXHIBIT K, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated June 27, 20t7. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. One (1) <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: June 27, 2017 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: HWC Engineering <br />d. Project: City of South Bend — Prairie Avenue Water Main <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />This Amendment includes the engineering services to complete the design, <br />bidding, construction engineering, and additional services for the <br />recommended project included in the scoping report. The detailed scope of <br />services is included in Attachment 2. This work will be completed as a part of <br />Exhibit A, Part 1— Basic Services and Part 2 — Additional Services. <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br />The original agreement approved on June 27, 2017 included the study & <br />report phase which consisted of completion of a scoping report to identify the <br />recommended route for the water main extension to "loop" the Four Winds <br />Casino water main to the City's water system and serve as a "Basis of <br />Design" for the project. The scoping report was approved by the City on <br />September 15, 2017. <br />This Amendment modifies the scope of services to include the design, <br />bidding, and construction engineering services in accordance with Exhibit A, <br />Part 1— Basic Services for the recommended project in the scoping report. It <br />also includes land acquisition services in accordance with Exhibit A, Part 2 — <br />Additional Services. The recommended project in the scoping report consists <br />of approximately 6,500 feet of 12-inch diameter water main and all <br />Page 1 <br />(Exhibit K — (Amendment No. One to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Behveen Owner and Engineer for Professional Services. <br />Copyright@ 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />