My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/28/1952 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1952
>
04/28/1952 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 9:50:21 AM
Creation date
11/8/2017 1:19:26 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/28/1952
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This being the time set, the Board proceeded with the opening of Bids, as follows; <br />'davit with <br />Reed Construction Co., <br />2121 N. Main St., <br />Mishawaka, Indiana. <br />= Proposal for the improvement of Angela Boulevard from the West <br />1 line of Michigan Sheet to the <br />dwardWest <br />AvenueotoLafayette <br />easteBrlyd*j and <br />line of <br />from the easterly line of Woo <br />. Portage Avenue by constructing complete in p Bituminous <br />lace acea aappurtenances. <br />Concrete (AH) Re -surf ace Pavement and <br />TOTAL ITEM EXTENSION------------------» <br />Completion within 45 calendar days. <br />A Non -Collusion Al <br />Bidder's Bond accompanied the <br />Bid - <br />I <br />A Non -Collusion Affidavit with <br />Seneca Petroleum Co., Inc. Certified Check for 0850.00 <br />439 West 33rd Street, accompanied the bid <br />� Chicago, Illinois. <br />�! Angela Boulevard from the west <br />• Proposal for the improvement of Ang <br />line of Michigan Street to the west line of Lafayette Blvd., and <br />of Woodward Ave. <br />to the easterly line of <br />from the easterly line <br />Portage Avenue by constructing complete in place a Bituminous <br />Concrete (AH) Re -surface Pavement and appurtenances. <br />�. TOTAL ITEM EXTENSION_ ___-__- ---------------$16,805.00 <br />• <br />• <br />No completion date indicated. <br />Rieth-Riley Construction Co. <br />South Bend, Indiana <br />A Non -Collusion Affidavit with <br />Bidder's Bond accompanied the <br />Bid -- <br />Proposal for the impe�on�hefw sgelanBoofevard from the Lafayette Blvd.,sand <br />line of Ivlichigan Street <br />from the easterly line of Woodward Ave. to the easterly line cif <br />Portage Avenue by constructing complete anin place a Bituminous <br />Concrete (AH) Re -surface Pavement <br />TOTAL ITEM EXTENSION----------- <br />--------------------------- <br />$149934.30 <br />Completion in 60 calendar days. <br />A Non -Collusion Affidavit with <br />Reed Construction Co., Bidderts Bond accompanied the <br />2122 N. Main St., Bid - <br />Mishawaka, Indiana <br />of <br />Proposal for the improvemeof Marietta Streetnt of Indiana ubyfconstructing rom west ecomplete <br />Miami Street to west line appurtenances. <br />in place a Bituminous Concrete (AH) Re -surface Pavement and <br />TOTAL ITEM EXTENSION----------------------------- <br />22, 979.00 <br />Completion within 45 calendar days. <br />A Non -Collusion Affidavit with <br />• 'j Seneca Petroleum Co., Inc. Certified Check for1300.00 <br />439 West 33rd Street, accompanied the bid <br />j Chicago, Illinois <br />Proposal for the improvement of Indiana Avenue from west line of <br />j Miami Street to west line of Marietta Street by constructing a <br />Bituminous Concrete (AH) Re -surface Pavement and all appurtenances. <br />TOTAL ITEM EXTENSION---------- <br />_-..--_----,.-----$25,472.50 <br />I No. completion date indicated. <br />A Non -Collusion Affidavit with <br />Rieth-Riley Construction Co., <br />South Bend, Indiana Bidderts Bond accompanied the <br />;II Bid. <br />f <br />Proposal for the improvement of Indiana Avenue from west line <br />Miami Street to west line oReMarietta <br />cting <br />surf ace Pavementy and alluappubtenances. <br />it a Bituminous Concrete (AH) <br />II TOTAL ITEM EXTENSION---------- <br />-----------------22,455.50 <br />Completion within 60 calendar days. <br />• i All bids were taken under advisement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.