Laserfiche WebLink
EDISON STREET Pavement Improvement according to <br />the lowest and best bid and that the contract to <br />Construction Company, said bid being as follows: <br />Improvement=Resolution No. 2663, 1951 is <br />..do said work be awarded to the Reed <br />if <br />1 <br />li <br />_ <br />Item.l-1 <br />Class "C" Type 1 - Cement Concrete pavementIC 3.25 <br />@ 1,30 <br />per sq. yd. <br />per cu, yd. <br />Item 2-1 <br />Excavation. <br />@ <br />per sq. y <br />i <br />Item 3 <br />Sub-grsde stabilization <br />@ <br />2.0 <br />2,00 <br />per tin. ft. <br />Item 5 <br />6" x 1611 concrete curb <br />15.00 <br />Each <br />Item 6 <br />Resetting menhole covers <br />Each <br />• <br />I <br />Item 7 <br />Resetting stormwater inlets <br />115-00 <br />@ <br />70.00 <br />Each <br />Item 8 <br />3%4" Short Water Service <br />EAST DAYTON STREET Pavement Improvement according <br />to Improvement Resolution No. 2668, <br />do work be awarded to the <br />1 <br />1951 is the lowest and best bid and that the contract to said <br />Reed Construction Company, said Bid being as follows: <br />Item 1-1 <br />u <br />Class C" Type 1 Cememnt Concrete <br />2 <br />Pavement � 3. 5 <br />1.30 <br />per s d. <br />p q y <br />cu. <br />Item 2-1 <br />Item-4 <br />Excavation <br />6" x.16'! Concrete curb <br />@ <br />@ 2.00 <br />per yd. <br />per lin. ft. <br />i <br />i <br />Item 5 <br />Resetting manhlle covers <br />@ 15.90 <br />1 <br />@ 5•00 <br />per each <br />per each <br />• <br />i Item 6 <br />i Item 7 <br />Resetting stormwater inlets <br />10" Pipe storm sewer <br />@ $ 3.00 per tin. ft. <br />LOMBARDY DRIVE <br />pavement improvement according to <br />Improvement Resolution No. 2669, 1951, <br />do be awarded to the Reed <br />is the lowest <br />and best bid and that the contract <br />to said work <br />Construction Company, <br />said bid being as follows: <br />i <br />Item 1-1 <br />Class "C" Type 1 Cement Concrete <br />pavement @ <br />3.25 <br />per sq. yd. <br />I Item 2-1 <br />Excavation <br />@ <br />@ <br />1.30 <br />8 2.00 <br />per cu. y d. <br />per lin. ft. <br />Item 4 <br />6" x 16" Concrete curb <br />15.00 <br />per each <br />Item 5 <br />i Item f <br />Resetting manhole covers <br />stormwater inlets (round) <br />@$40.00 <br />Per each <br />Item 7 <br />10" Pipe storm sewer <br />@ <br />$ 3.00 <br />per lin. ft. <br />• <br />WEST 1/2 OF FELLOWS STREET pavement improvement according to Improvement <br />to do said <br />Resolution No. <br />work be awarded <br />1 2670, 1951 is <br />the lowest and best bid and that the contract <br />to the Reed Construction Company, said bid being <br />as follows: <br />Item 1-1 Class "C" Type 1 Cement Cone rete pavement @ 3.25 per sq. yd. <br />Item 2-1 Excavation @ 1,30 per cu. yd. <br />Item 4 Type A - Combined curb & gutter @ 1,50 per lin, ft, <br />Item 5 Resetting Manhole covers 15.00 per each <br />j Item 6 New stormwater inlets (large) @ 70,00 per each <br />Item 7 10i' pipe storm sewer @ 1 3.00 per lin, ft. <br />Item 8 4" Cement sidewalk @ 0.35 per sq. ft. <br />• Therefor Be It Resolved, By the Board of Public Works and Safety of the City of Sou <br />Bend, Indiana, that the bids of the Reed Construction Company for the construction of <br />the improvements described in Improvement Resolutions Nos.. 2661, 2663, 26682 2669 & 2670 <br />1951, passed by this Board on April 91 1951, and confirmed by this Board on May 70 1951, <br />be and the same are hereby adopted and that the City of South Bend, Indina, thru its Mayc <br />and Board of Public Works and Safety enter into a written contract vith said Reed Construc <br />tion Company for the faithful executor of such work, according to said bids, the detailed <br />!j plans and specifications and the terms of said Resolutions, provided that before entering <br />upon the performance:.of°said contracts, said Reed Cors truction Company shall give bond, <br />jin the amount equal to one hundred (100) per cent of the contract price for such work <br />with a Surety Company legally authorized to transact business in the State of Indiana, <br />• 1 as Surety, to the approval of this Board, to secure the performance of such contracts, <br />and,shall give a Maintenance Bond in the amount equal to fifty (50) per cent of the con- <br />tract price for such work, with a Surety Company legally authorized to transact business <br />in the State of Indiana, as Surety, to the approval of this Board to warrant and quarante <br />the , work, material and. condition of the pavements for a period. of three (3) years, and tc <br />hold the City of South Bend, Indiana, harmless from payment of any debt or damage by rea: <br />of any act of such Contractor, and to secure the payments of all claims for labor and ma• <br />1I terial used in such improvements. <br />(Signed) R. S. Andrysiak <br />F. K, Baer <br />Frank J. Bruggner _ <br />• BOARD OF PUBLIC WORKS & SAFETY <br />Freda G. Noble, Clerk <br />1 A Certificate of Insurance was approved and ordered filed for the Reed Construction <br />Company covering the above contracts. <br />GARBAGE DISPOSAL: ams and Associates, wherein <br />A Proposal was received from Clyde E. Willi <br />they propose to make an extensive study and survey of garbage and refuse disposal for the <br />jCity of South Bend, Indiana for an amount not to exceed a maximum of $900. The Board <br />discussed this proposal, but before accepting it, asked that Clyde E. Williams and Asso- <br />ciates should include in the survey the advisability of the City entering into the work <br />by having its own equipment and personnel. <br />