EDISON STREET Pavement Improvement according to
<br />the lowest and best bid and that the contract to
<br />Construction Company, said bid being as follows:
<br />Improvement=Resolution No. 2663, 1951 is
<br />..do said work be awarded to the Reed
<br />if
<br />1
<br />li
<br />_
<br />Item.l-1
<br />Class "C" Type 1 - Cement Concrete pavementIC 3.25
<br />@ 1,30
<br />per sq. yd.
<br />per cu, yd.
<br />Item 2-1
<br />Excavation.
<br />@
<br />per sq. y
<br />i
<br />Item 3
<br />Sub-grsde stabilization
<br />@
<br />2.0
<br />2,00
<br />per tin. ft.
<br />Item 5
<br />6" x 1611 concrete curb
<br />15.00
<br />Each
<br />Item 6
<br />Resetting menhole covers
<br />Each
<br />•
<br />I
<br />Item 7
<br />Resetting stormwater inlets
<br />115-00
<br />@
<br />70.00
<br />Each
<br />Item 8
<br />3%4" Short Water Service
<br />EAST DAYTON STREET Pavement Improvement according
<br />to Improvement Resolution No. 2668,
<br />do work be awarded to the
<br />1
<br />1951 is the lowest and best bid and that the contract to said
<br />Reed Construction Company, said Bid being as follows:
<br />Item 1-1
<br />u
<br />Class C" Type 1 Cememnt Concrete
<br />2
<br />Pavement � 3. 5
<br />1.30
<br />per s d.
<br />p q y
<br />cu.
<br />Item 2-1
<br />Item-4
<br />Excavation
<br />6" x.16'! Concrete curb
<br />@
<br />@ 2.00
<br />per yd.
<br />per lin. ft.
<br />i
<br />i
<br />Item 5
<br />Resetting manhlle covers
<br />@ 15.90
<br />1
<br />@ 5•00
<br />per each
<br />per each
<br />•
<br />i Item 6
<br />i Item 7
<br />Resetting stormwater inlets
<br />10" Pipe storm sewer
<br />@ $ 3.00 per tin. ft.
<br />LOMBARDY DRIVE
<br />pavement improvement according to
<br />Improvement Resolution No. 2669, 1951,
<br />do be awarded to the Reed
<br />is the lowest
<br />and best bid and that the contract
<br />to said work
<br />Construction Company,
<br />said bid being as follows:
<br />i
<br />Item 1-1
<br />Class "C" Type 1 Cement Concrete
<br />pavement @
<br />3.25
<br />per sq. yd.
<br />I Item 2-1
<br />Excavation
<br />@
<br />@
<br />1.30
<br />8 2.00
<br />per cu. y d.
<br />per lin. ft.
<br />Item 4
<br />6" x 16" Concrete curb
<br />15.00
<br />per each
<br />Item 5
<br />i Item f
<br />Resetting manhole covers
<br />stormwater inlets (round)
<br />@$40.00
<br />Per each
<br />Item 7
<br />10" Pipe storm sewer
<br />@
<br />$ 3.00
<br />per lin. ft.
<br />•
<br />WEST 1/2 OF FELLOWS STREET pavement improvement according to Improvement
<br />to do said
<br />Resolution No.
<br />work be awarded
<br />1 2670, 1951 is
<br />the lowest and best bid and that the contract
<br />to the Reed Construction Company, said bid being
<br />as follows:
<br />Item 1-1 Class "C" Type 1 Cement Cone rete pavement @ 3.25 per sq. yd.
<br />Item 2-1 Excavation @ 1,30 per cu. yd.
<br />Item 4 Type A - Combined curb & gutter @ 1,50 per lin, ft,
<br />Item 5 Resetting Manhole covers 15.00 per each
<br />j Item 6 New stormwater inlets (large) @ 70,00 per each
<br />Item 7 10i' pipe storm sewer @ 1 3.00 per lin, ft.
<br />Item 8 4" Cement sidewalk @ 0.35 per sq. ft.
<br />• Therefor Be It Resolved, By the Board of Public Works and Safety of the City of Sou
<br />Bend, Indiana, that the bids of the Reed Construction Company for the construction of
<br />the improvements described in Improvement Resolutions Nos.. 2661, 2663, 26682 2669 & 2670
<br />1951, passed by this Board on April 91 1951, and confirmed by this Board on May 70 1951,
<br />be and the same are hereby adopted and that the City of South Bend, Indina, thru its Mayc
<br />and Board of Public Works and Safety enter into a written contract vith said Reed Construc
<br />tion Company for the faithful executor of such work, according to said bids, the detailed
<br />!j plans and specifications and the terms of said Resolutions, provided that before entering
<br />upon the performance:.of°said contracts, said Reed Cors truction Company shall give bond,
<br />jin the amount equal to one hundred (100) per cent of the contract price for such work
<br />with a Surety Company legally authorized to transact business in the State of Indiana,
<br />• 1 as Surety, to the approval of this Board, to secure the performance of such contracts,
<br />and,shall give a Maintenance Bond in the amount equal to fifty (50) per cent of the con-
<br />tract price for such work, with a Surety Company legally authorized to transact business
<br />in the State of Indiana, as Surety, to the approval of this Board to warrant and quarante
<br />the , work, material and. condition of the pavements for a period. of three (3) years, and tc
<br />hold the City of South Bend, Indiana, harmless from payment of any debt or damage by rea:
<br />of any act of such Contractor, and to secure the payments of all claims for labor and ma•
<br />1I terial used in such improvements.
<br />(Signed) R. S. Andrysiak
<br />F. K, Baer
<br />Frank J. Bruggner _
<br />• BOARD OF PUBLIC WORKS & SAFETY
<br />Freda G. Noble, Clerk
<br />1 A Certificate of Insurance was approved and ordered filed for the Reed Construction
<br />Company covering the above contracts.
<br />GARBAGE DISPOSAL: ams and Associates, wherein
<br />A Proposal was received from Clyde E. Willi
<br />they propose to make an extensive study and survey of garbage and refuse disposal for the
<br />jCity of South Bend, Indiana for an amount not to exceed a maximum of $900. The Board
<br />discussed this proposal, but before accepting it, asked that Clyde E. Williams and Asso-
<br />ciates should include in the survey the advisability of the City entering into the work
<br />by having its own equipment and personnel.