My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/05/1951 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1951
>
03/05/1951 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 9:54:06 AM
Creation date
11/1/2017 10:23:13 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/5/1951
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
240 <br />The First East-West alley South Of Wilson Street from the east line of 24th Street, <br />East a distance of 588 feet to the East line of Lots No. 9 and 24 in Tuxedo Park <br />First Addition of Lots in Jefferson Heights Addition. <br />The following property may be .injuriously or beneficially effected by such vacation: <br />Lots numbered 1 to 16 inclusive Lucas Sub -Division <br />and <br />Lots numbered 1 to 33 inclusive in Tuxedo Park First Addition of <br />Lots in Jefferson Heights Addition <br />AND <br />Lots numbered 34 to 42 inclusive in Tuxedo Park Second Addition of <br />Lots in Jefferson Heights Addition. <br />Notice of this Resolution shall be published Dn the 9.th day of March and on the 16th <br />day of March, 1951, in the South Bend Daily Tribune and the Weekly Record. <br />This Board, at its office in the City Hall on the 26th day of March, 1951, at 11:00 <br />a.m., will hear and receive remonstrances from all, persons interested in or affected by <br />theze proceedings. <br />Adopted this 5th day of March, 1951. <br />R. S. Andrysiak <br />F. K. Baer <br />Frank J. Bruggner <br />BOARD OF PUBLIC .VORKS & SAFETY <br />The Board approved a plat of Hartman's William Morris Addition formerly Lot No. 338, <br />Coquillard Proposed Farm Plat Unrecorded. <br />The Board approved plans for the resurfacing of Main Street from Western Avenue to <br />LaSalle Street. <br />The Board approved plans for the widening of William Street from Washington Street <br />to Western Avenue. <br />A petition was received asking for the improvement of Vassar Street from Olive to <br />OtBrien Street by the construction of pavement, curb and -sidewalks. This was referred <br />to the Engineering Department. <br />STREET DEPARTMENT: Melton 0. Brannan, Street Commissioner, was present and matters per- <br />taining to his Department were discussed. <br />The following bids were received by the Board for materials for use in the Street <br />Department and the Board felt that because of the difference in prices of these bids and <br />those previously received and because of the easy access to their yards, these bids shou <br />also be accepted: <br />Kuert Concrete, Inc., <br />3113 Lincoln Way West <br />South Bend, Indiana <br />Ready mixed concrete in following strengths, using gravel <br />as the coarse aggregate: <br />2500# <br />- FOB <br />Plant <br />- per cu. <br />yd. <br />$7.55 <br />3000# <br />- FOB <br />Plant <br />- per cu. <br />yd. <br />7.85 <br />3500# <br />- FOB <br />Plant <br />- per cu. <br />yd. <br />8.40 <br />Ready mixed concrete in following strengths using crushed <br />limestone as the coarse aggregate: <br />2500# <br />- FOB <br />Plant <br />- per cu. <br />yd. <br />8.85 <br />3000# <br />- FOB <br />Plant <br />- per cu. <br />yd. <br />9.15 <br />3500# <br />- FOB <br />Plant <br />- per cu. <br />yd. <br />9.70 <br />A Non -Collusion Affida- <br />vit accompanied the bid. <br />Add $1.00 per yard to above prices for winter concrete during period of November 15 <br />to and through March 15. Add .50 per cu. yd for 2% calcuum chloride as required by job. <br />C. D. Smelser Company, Inc., <br />511 W. Colfax Avenue <br />South Bend 7, Indiana <br />Pea Gravel . . . . . . . . $ 1.00 ton <br />Concrete or asphalt sand . . 1.00 ton <br />Concrete gravel. 1.25 ton <br />all materials loaded into your trucks at our East Jefferson Road Plant, Mishawaka. <br />• <br />• <br />• <br />• <br />is <br />
The URL can be used to link to this page
Your browser does not support the video tag.