Fr_224 <br />CONTRACT "4-A" <br />Original Alignment: <br />i <br />91/06 to 107�31 - 1625 ft. @ $87.81 <br />jRevised( Alignment; <br />j91/06 to 106/60 - 1554 ft. @ $-87.81 <br />SMMMARY <br />Original 3-B <br />Original 4-A <br />Revised 3-B <br />Revised 4-A <br />116,223.94 <br />142, 691.25 <br />56,915 9 <br />96,786,90 <br />136,456.74 <br />7�3, 2 3. <br />Total Savings <br />142, 691.25 <br />136.456.74 <br />258,915.19. <br />6 233.243.64 <br />The following letter was drafted by the Board: <br />Barney Massa Construction Company <br />4925 Avondale Street <br />Fort Wayne, Indiana <br />Gentlemen: <br />This is your authorization to start construction of the revised intercepting <br />chamber for Outlet No. 3, Contract 3A at Station 110/89. <br />The breakdown will be as follows: <br />88 Cu. Yds. of sub -surface formed concrete <br />@ �"60.00 per Cu. Yd. <br />20 Cu. Yds. of fillet concrete <br />$40.00 Per Cu. Yd. <br />13,200 Lbs. of steel reinforcing <br />.20 per lb. <br />4 ft. manhole wall , $40.00 per ft. <br />2 - Cast Iron Back `grater_ gates installed <br />�:2, 000 each <br />Cast Iron Frar:ne and Cover <br />Cast Iron Steps in Place <br />Special Concrete Cover Slabs for Gate Inlet Chamber` <br />1000 Cu. Yds. Excavation and Refill �4�.2.00 per Cu. Yd. <br />2000 Sq. Ft. Sheeting for Deep ;,=et Construction <br />.60 Per So. Ft. <br />Installation of 2 temporary 15" flumes for dry weather <br />(1201) flow ^ $8.00 <br />Ditching and cutting in for storm water diversion <br />during construction <br />Pumping of lower ten feet of excavation during construction <br />20 days � Y80.00 <br />5,280.00 <br />800.00 <br />2,640.00 <br />160.00 <br />4,000.00 <br />40.00 <br />50.00 <br />400.00 <br />2,000.00 <br />1,200.00 <br />960.00 <br />750.00 <br />1,600.00 <br />For the Total Sum of w 19,880.00 <br />The proposed revised chamber takes the place of two chambers in the original design <br />which design change was necessitated by the moving of the sewer line through the <br />Loekjoint Tube Company property. The total net effect of the change results in a <br />saving to the City because of reduced length of 84 inch sewer pipe now required. <br />Very truly yours, <br />BOARD OF PUBLIC WORKS& SAFETY <br />cc: Consoer, Townsend & Associates By: Freda G. Noble, Clerk <br />STREET DEPARTMENT: Melton 0. Brannan, Street Commissioner, was present and matters per- <br />taining to his Department were discussed. <br />Mr. Pr•annan presented his requirements on street maintenance supplies and the Clerk <br />of the Board was directed to advertise for same. The bids to be returned January 29, <br />1951. <br />0 <br />40 <br />• <br />• <br />0 <br />