Laserfiche WebLink
145 <br />• <br />• <br />E <br />• <br />AWARDING CONTRACT <br />No. 2623, 1950 <br />South Bend, Indiana <br />July 10, 1950 <br />After due investigation of all bids and being duly advised on the promises, the Boar <br />of Public Works and Safety decides that the bid of the Rieth-Riley Construction Company, <br />South Bend, Indiana for the construction of the improvement known as GLADSTONE AVENUE pav <br />ment Improvement according to Improvement Resolution No. <br />2623., 1950 is <br />lowestbes <br />bid and that the contract to do said work be awarded to the Rieth-RileytConstructiondCom- <br />pany, South Bend, Indiana. Said bid being as follows: <br />Item <br />Item <br />No. <br />2-1 <br />1-1 <br />Class "C" Type 1 Cement Concrete Pavement <br />Excavation <br />4..632 <br />Sq. Yd. <br />3.25 <br />Item <br />Item <br />No. <br />3 <br />Sub -grade Stabilization <br />1,030 <br />4.,632 <br />Cu. Yd. <br />1.20 <br />Item. <br />No. <br />5 <br />6t1 x 161' Std. Concrete Curb <br />50 <br />Sq. Yd. <br />0.10 <br />Item <br />No, <br />6 <br />Resetting Sewer Manhole Covers <br />4 <br />Lin. Ft. <br />Each <br />2.2p <br />Item <br />No. <br />No. <br />7 <br />8 <br />Resetting Water Manhole Covers <br />Resetting Stormwater <br />4 <br />Each <br />15.00 <br />15.00 <br />Item <br />No. <br />9 <br />Inlets <br />811 Std. Pipe Storm Sewer <br />8 <br />Each <br />30.00 <br />30 Lin. Ft. <br />5.00 <br />(I'Therefor Be It Resolved, By the Board of Public Works and Safety of the City of South Ben <br />ndiana that the bid of the Rieth-Riley Construction Company, South Bend' Indiana <br />� <br />,construction of the improvement described in Improvement Resolution No. 95 for the <br />by this Board on May 8, 1950, and confianed by -this Board on June 12, 1950 beand ttheasame <br />lis hereby adopted and that the City of South Bend, Indiana thru its Mayor End Board of <br />Public Works and Safety enter into a written contract with said Rieth-Riley Construction <br />Company, South Bend, Indiana for the faithful executor of such work, according to said <br />;bid, the detailed plans and specifications and the terms of said Resolution, provided <br />1that before entering upon the performance of said contract, said Rieth-Rile <br />Company, South Bend, Indiana shall give bond, in the amount equal to one hunConstruction <br />dred(100) <br />per cent of the contract price for such work, with a Surety Company legally authorized to <br />transact business in the State of Indiana, as Surety, to the Epproval of this Board, to <br />secure the performance of such contract, and shall give a Maintenance Bond in the amount <br />equal to fifty (50) per cent of the contract price for such work, vd th a Surety Company <br />Ilegally authorized to transact business in the State of Indiana, as Surety, to the ep pro- <br />val of this Board to warrant and quarantee the work, material and condition of the pave- <br />ment for a period of three (3) years, and to hold the City of South Bend, Indiana, harm- <br />less from payment of any debt or damage by reason of any act of such Contractor, aj:ld to <br />secure the payment of all claims for labor and material used in such improvement. <br />(Signed) R. S. Andrysiak <br />F. K. Baer <br />Freda G. Noble, Clerk Frank J. Bruggner <br />B0AiD OF PUBLIC WORKS & SAFETY <br />AWARDING CONTRACTS <br />Nos. 2624 and 2629, 1950 <br />South Bend, Indiana <br />July 10, 1950 <br />After due investigation of all bids and being duly advised on the promises, the Boar <br />of Public Works and Safety decides that the bids of the Reed Construction Comp any, Misha- <br />waka, Indiana for the construction of the improvement known as CHICAGO STREET PAVEMENT <br />Improvement according to Improvement Resolution No. , 24,1950 is the lowest and best bid <br />and that the contract to do said work be awarded to the Reed Construction Company, Misha- <br />waka, Indiana, Said Bid being as follows: <br />Item <br />Item <br />No. <br />No. <br />1-1 <br />2-1 <br />Class 11C11 - Type 1 Cement Concrete Pavement 4,3390 <br />Excavation <br />Sq. Yd. <br />3.05 <br />Item <br />No. <br />3 <br />Sub -grade Stabilization <br />80 <br />4 39O <br />C u. <br />Yd. <br />1.10 <br />Item <br />No. <br />5 <br />6 x 16 Std. Concrete Curb <br />10 <br />q. <br />0.20 <br />Item <br />Item. <br />No. <br />No. <br />6 <br />7 <br />Type "A" Concrete Curb & Gutter <br />Resetting Sewer <br />1,240 <br />Lin. Ft. <br />Lin. Ft. <br />1.75 <br />.20 <br />Item <br />No. <br />8 <br />Manhole Covers <br />Resetting Water Manhole Covers <br />3 <br />5 <br />Each <br />Each <br />15.00 <br />Item <br />Item <br />No. <br />No. <br />9 <br />10 <br />Std. Curb & Gutter Stormwater Inlets <br />Resetting Stormwater <br />4. Each <br />15.00 <br />45.00 <br />Item <br />No. <br />11 <br />Inlets <br />10" Std. Pipe Storm Sewer <br />4 <br />Each <br />15.00 <br />Item <br />No. <br />12 <br />3/4f1 Long 'Water Service <br />40 <br />4 <br />Lin. Ft'. <br />Each <br />2. �5 <br />Item <br />No. <br />13 <br />3/4" Short Water Service <br />6 5.00 <br />Item <br />No. <br />14 <br />4 Std. Cement Concrete Sidewalk <br />2 <br />100 <br />Each <br />Sq. Ft. <br />5.00 <br />0.40 <br />,ND, VASSAR AVENUE <br />9502 is the lowest <br />PAVEMENT Improvement according to Improvement Resolution No. <br />and best bid <br />2529, <br />onstruction <br />and that the contract to do <br />Company, Mishawaka, Indiana. Said Bid being <br />said work be awarded <br />to Reed <br />as <br />follows: <br />Item <br />Item <br />No. <br />No. <br />1 <br />2-1 <br />Class "C" Type 1 Cement Concrete Pavement <br />Excavation <br />2,222 <br />Sq. Yd. <br />3.10 I <br />Item <br />No. <br />4 <br />it n <br />6 x 16 Std. Concrete Curb <br />502 <br />430 <br />Cu. Yd. <br />Lin. Ft. <br />1.10 i <br />1:60 i <br />