<br />AWARDING CONTRACT
<br />No. 2623, 1950
<br />South Bend, Indiana
<br />July 10, 1950
<br />After due investigation of all bids and being duly advised on the promises, the Boar
<br />of Public Works and Safety decides that the bid of the Rieth-Riley Construction Company,
<br />South Bend, Indiana for the construction of the improvement known as GLADSTONE AVENUE pav
<br />ment Improvement according to Improvement Resolution No.
<br />2623., 1950 is
<br />lowestbes
<br />bid and that the contract to do said work be awarded to the Rieth-RileytConstructiondCom-
<br />pany, South Bend, Indiana. Said bid being as follows:
<br />Item
<br />Item
<br />No.
<br />2-1
<br />1-1
<br />Class "C" Type 1 Cement Concrete Pavement
<br />Excavation
<br />4..632
<br />Sq. Yd.
<br />3.25
<br />Item
<br />Item
<br />No.
<br />3
<br />Sub -grade Stabilization
<br />1,030
<br />4.,632
<br />Cu. Yd.
<br />1.20
<br />Item.
<br />No.
<br />5
<br />6t1 x 161' Std. Concrete Curb
<br />50
<br />Sq. Yd.
<br />0.10
<br />Item
<br />No,
<br />6
<br />Resetting Sewer Manhole Covers
<br />4
<br />Lin. Ft.
<br />Each
<br />2.2p
<br />Item
<br />No.
<br />No.
<br />7
<br />8
<br />Resetting Water Manhole Covers
<br />Resetting Stormwater
<br />4
<br />Each
<br />15.00
<br />15.00
<br />Item
<br />No.
<br />9
<br />Inlets
<br />811 Std. Pipe Storm Sewer
<br />8
<br />Each
<br />30.00
<br />30 Lin. Ft.
<br />5.00
<br />(I'Therefor Be It Resolved, By the Board of Public Works and Safety of the City of South Ben
<br />ndiana that the bid of the Rieth-Riley Construction Company, South Bend' Indiana
<br />�
<br />,construction of the improvement described in Improvement Resolution No. 95 for the
<br />by this Board on May 8, 1950, and confianed by -this Board on June 12, 1950 beand ttheasame
<br />lis hereby adopted and that the City of South Bend, Indiana thru its Mayor End Board of
<br />Public Works and Safety enter into a written contract with said Rieth-Riley Construction
<br />Company, South Bend, Indiana for the faithful executor of such work, according to said
<br />;bid, the detailed plans and specifications and the terms of said Resolution, provided
<br />1that before entering upon the performance of said contract, said Rieth-Rile
<br />Company, South Bend, Indiana shall give bond, in the amount equal to one hunConstruction
<br />dred(100)
<br />per cent of the contract price for such work, with a Surety Company legally authorized to
<br />transact business in the State of Indiana, as Surety, to the Epproval of this Board, to
<br />secure the performance of such contract, and shall give a Maintenance Bond in the amount
<br />equal to fifty (50) per cent of the contract price for such work, vd th a Surety Company
<br />Ilegally authorized to transact business in the State of Indiana, as Surety, to the ep pro-
<br />val of this Board to warrant and quarantee the work, material and condition of the pave-
<br />ment for a period of three (3) years, and to hold the City of South Bend, Indiana, harm-
<br />less from payment of any debt or damage by reason of any act of such Contractor, aj:ld to
<br />secure the payment of all claims for labor and material used in such improvement.
<br />(Signed) R. S. Andrysiak
<br />F. K. Baer
<br />Freda G. Noble, Clerk Frank J. Bruggner
<br />B0AiD OF PUBLIC WORKS & SAFETY
<br />AWARDING CONTRACTS
<br />Nos. 2624 and 2629, 1950
<br />South Bend, Indiana
<br />July 10, 1950
<br />After due investigation of all bids and being duly advised on the promises, the Boar
<br />of Public Works and Safety decides that the bids of the Reed Construction Comp any, Misha-
<br />waka, Indiana for the construction of the improvement known as CHICAGO STREET PAVEMENT
<br />Improvement according to Improvement Resolution No. , 24,1950 is the lowest and best bid
<br />and that the contract to do said work be awarded to the Reed Construction Company, Misha-
<br />waka, Indiana, Said Bid being as follows:
<br />Item
<br />Item
<br />No.
<br />No.
<br />1-1
<br />2-1
<br />Class 11C11 - Type 1 Cement Concrete Pavement 4,3390
<br />Excavation
<br />Sq. Yd.
<br />3.05
<br />Item
<br />No.
<br />3
<br />Sub -grade Stabilization
<br />80
<br />4 39O
<br />C u.
<br />Yd.
<br />1.10
<br />Item
<br />No.
<br />5
<br />6 x 16 Std. Concrete Curb
<br />10
<br />q.
<br />0.20
<br />Item
<br />Item.
<br />No.
<br />No.
<br />6
<br />7
<br />Type "A" Concrete Curb & Gutter
<br />Resetting Sewer
<br />1,240
<br />Lin. Ft.
<br />Lin. Ft.
<br />1.75
<br />.20
<br />Item
<br />No.
<br />8
<br />Manhole Covers
<br />Resetting Water Manhole Covers
<br />3
<br />5
<br />Each
<br />Each
<br />15.00
<br />Item
<br />Item
<br />No.
<br />No.
<br />9
<br />10
<br />Std. Curb & Gutter Stormwater Inlets
<br />Resetting Stormwater
<br />4. Each
<br />15.00
<br />45.00
<br />Item
<br />No.
<br />11
<br />Inlets
<br />10" Std. Pipe Storm Sewer
<br />4
<br />Each
<br />15.00
<br />Item
<br />No.
<br />12
<br />3/4f1 Long 'Water Service
<br />40
<br />4
<br />Lin. Ft'.
<br />Each
<br />2. �5
<br />Item
<br />No.
<br />13
<br />3/4" Short Water Service
<br />6 5.00
<br />Item
<br />No.
<br />14
<br />4 Std. Cement Concrete Sidewalk
<br />2
<br />100
<br />Each
<br />Sq. Ft.
<br />5.00
<br />0.40
<br />,ND, VASSAR AVENUE
<br />9502 is the lowest
<br />PAVEMENT Improvement according to Improvement Resolution No.
<br />and best bid
<br />2529,
<br />onstruction
<br />and that the contract to do
<br />Company, Mishawaka, Indiana. Said Bid being
<br />said work be awarded
<br />to Reed
<br />as
<br />follows:
<br />Item
<br />Item
<br />No.
<br />No.
<br />1
<br />2-1
<br />Class "C" Type 1 Cement Concrete Pavement
<br />Excavation
<br />2,222
<br />Sq. Yd.
<br />3.10 I
<br />Item
<br />No.
<br />4
<br />it n
<br />6 x 16 Std. Concrete Curb
<br />502
<br />430
<br />Cu. Yd.
<br />Lin. Ft.
<br />1.10 i
<br />1:60 i