My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - RFQ VPA Energy Savings Contract - Honeywell - Part 3
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Proposals - RFQ VPA Energy Savings Contract - Honeywell - Part 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:10:31 PM
Creation date
10/13/2017 9:31:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Solar PV Expansion Savings <br />C. Post Operation <br />1 Photovoltaic system AC output 75.225 kW Based on 88,500 Watt nameplate DC power rating <br />2 Array tilt angle 45 degrees Estimated Sawtooth Angle of Roof <br />3 Array azimuthal angle 175 degrees <br />4 Hourly photovoltaic system output from PVWatts based on TMY data <br />Month <br />Da <br />Hour <br />AC Power, <br />W <br />Daily Output at <br />14:00, W <br />January <br />1 <br />01:00. <br />0 <br />February <br />1 <br />02:00 <br />0 <br />March <br />1 <br />03:00 <br />0 <br />April <br />1 <br />04:00 <br />0 <br />Ma <br />1 <br />05:00 <br />0 <br />June <br />1 <br />06:00 <br />0 <br />July <br />1 <br />07:00 <br />0 <br />August <br />1 <br />08:00 <br />0 <br />September <br />1 <br />09:00 <br />1236.672 <br />October <br />1 <br />10:00 <br />3338.96 <br />November <br />1 <br />11:00 <br />10347.319. <br />December <br />1 <br />12:00 <br />1 13675.448 <br />5 PV system monthly electric energy production and minimum power output at 14:00. <br />Month <br />Electric <br />Energy Prod, <br />kWh <br />Min Output <br />at 14:00, kW <br />January <br />7,314 <br />12.2 <br />February <br />8,440 <br />11.2 <br />March <br />9,585 <br />12.2 <br />April <br />10,380 <br />13.4 <br />May <br />11,559 <br />13.7 <br />June <br />11,075 <br />24.7 <br />July <br />11,514 <br />21..6 <br />August <br />11,215 <br />22.0 <br />September <br />10,244 <br />19.0 <br />October <br />10,091 <br />16.6 <br />November <br />6,662 <br />6.7 <br />December <br />5,518 <br />10.4 <br />Annual Totals <br />113,596 <br />183.8 <br />D..Savings Determination <br />Baseline Operation <br />Post Operation <br />Savings <br />Electrical <br />Electrical <br />Cons, kW- <br />Demand, kW <br />hrs <br />Cost <br />1,316,883 <br />3,305 <br />$114,720 <br />1,203,287 <br />3,121 <br />$106,039 <br />113,596 <br />184 <br />$8,680 <br />3.23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.