ECM M&V Method <br />Calibration (per NIST standards) within the past 12 months of performing the <br />measurements. Where applicable, the measurements will be performed at a wall <br />switch. If it Is not possible to isolate the fixtures on one switch then measurements <br />will be performed at the individual fixture. <br />5. How will the measurements be used to determine actual savings: The pre and <br />post field measurements (watts) will be inserted in the original calculation <br />spreadsheet to determine the actual savings. <br />6. How often will measurements be performed: Pre -retrofit power measurements <br />Will be taken once immediately before work begins. After installation, the post - <br />retrofit power measurements will be taken once to determine actual savings for the <br />first year. <br />7. Stipulated values used: Burn hours of the fixtures are stipulated as presented in <br />the lighting calculation spreadsheets included in the savings calculation section of <br />the contract. These values were determined through discussions with the <br />Customer and are agreed to by all parties. <br />Summary: Wattages, determined as previously described, operating hours, as set forth <br />in In the energy calculation section and the savings calculations, as set forth in the <br />energy calculation section, shall be used to determine savings for the entire guarantee <br />period. <br />Agreed Upon savings are recommended and shall be utilized for this ECM. The <br />savings amount relative to the cost of M&V activities does not justify traditional <br />measurement and verification techniques. Ameresco will perform verification that the <br />ECM 2: controls are functioning properly and are capable of operating the equipment as <br />Controls designed. This process includes a process of collecting data on the equipment and <br />verifying that the savings are being achieved The stipulated assumptions and savings <br />calculations are documented in the calculations portion of the contract, and upon <br />ro ect completion will be used to document the achieved savings. <br />ECM 3: Agreed Upon savings are recommended and shall be utilized for this ECM. The <br />Mechanical savings amount relative to the cost of M&V activities does not justify other methods. <br />Upgrades <br />1. <br />Measurement and Verification Method: The method for verification of savings <br />associated with this ECM is based on IPMVP Option A. <br />2. <br />What will be measured: Flow rates, on a sample of single fixtures, shall be <br />measured on fixtures with a population of 20 or more. <br />3. <br />Sample size to be measured: Measurements shall be taken of a representative <br />sample, the size of which shall not exceed 5% of the population, for unique retrofit <br />types which have a total population of 10 or more. Measurements may not be taken <br />at smaller facilities where the costs associated with such measurements will exceed <br />the savings anticipated for the facility. Measurements taken at other facilities for the <br />ECM 4: <br />same type of fixture will be used for those calculations. For retrofits with less than <br />Water <br />this population the manufacturer's published flow rates for each fixture type as <br />Conservatio <br />referenced in the energy calculation section of the contract shall be used. <br />n 4. <br />How will measurements be made: Water flow (gallons per minute) measurements <br />will be performed with a calibrated bag and stopwatch or a flow meter. <br />5. <br />How will the measurements be used to determine actual savings: The pre and <br />post field measurements will be inserted in the original calculation spreadsheet to <br />determine the actual savings. <br />6. <br />How often will measurements be performed: Pre -retrofit flow measurements will <br />be taken once immediately before work begins, After installation, the post -retrofit <br />flow measurements will be taken once to determine actual savings for the first year. <br />7. <br />Stipulated values used: Number of flushes, minutes of flow, uses per day and <br />other usage related variables are stipulated as presented in the water savings <br />calculation spreadsheets included in the savings calculation section of the contract. <br />Confidential & Proprietary Information of Ameresco, Inc. <br />Page 52 <br />