My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - 2017 Demolitions Phase I - Project No 117-065 - Ritschard Bros Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 1 - 2017 Demolitions Phase I - Project No 117-065 - Ritschard Bros Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:35:04 PM
Creation date
10/13/2017 9:02:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 01 <br />2017 Demolitions, Phase I <br />. Project No.117-065 <br />c. Wrapping newly sheathed wall with Tyvek (or equal) wrap and tape all joints. <br />d. Furnishing and installing vinyl siding that matches the existing on the south side or <br />meets the property owner's approval. <br />e. Furnishing and installing new gutter and downspout on the east wall. <br />f. Repairing roof edge on east wall. <br />g. Furnishing and installing metal corner pieces at northeast corner of the building to <br />encapsulate the cut brick and block. <br />2. Payment for BUILDING REPAIR shall be the Lump Sum Unit Price for BUILDING <br />REPAIR as set forth in the bid/proposal. <br />DRAWINGS: <br />The following sheets have been revised and are issued as new sheets as a part of this Change Order: <br />NO CHANGE <br />END CHANGE ORDER 1 <br />SHEET 3 OF 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.