Laserfiche WebLink
A After approval of the conceptual plan by the Owner, the Engineer shall develop Design <br />and Plans for the addition of bumpouts in in accordance with the approved conceptual <br />plan, including drainage modifications and sidewalk replacement/reconstruction, as <br />required, including: <br />I) Develop preliminary & final design and plans including: <br />i) Develop geometrics and detailed grading for all curb ramps <br />ii) Develop plans for new curb and sidewalk <br />iii) Pavement Marking Plan <br />2) Develop preliminary & final specifications, quantity calculations and opinion of <br />probable construction costs. <br />IV. Add Sub -Section A.14. to Section A1.02 of Exhibit A as follows: <br />14. The Engineer shall prepare an Alignment Study for the realignment of LaSalle <br />Avenue at Colfax. The options will examine and try to balance the relationship <br />between grades, sight distance (effective design speed), impact to the parking area <br />and impact to the adjoining land owners to remain. Alignments and grades will be <br />presented in a graphic. Several options for the parking area will be developed and <br />refined, along with checking turning movements for the cemetery maintenance <br />entrance drive. <br />V. Add Sub -Section A.33. to Section A2.01 as follows: <br />33. Design, Modernization or Modification of a traffic signal. <br />VI. Revise Table in Item A.I. of Section C2.01 of Exhibit C as follows: <br />Item <br />Description <br />Amount <br />Type <br />Design Services: <br />$'28,900.00 <br />Lump <br />a. <br />Topographic Survey <br />Sum <br />$7,500.00 <br />Lump <br />b. <br />Study and Report Phase <br />Sum <br />$2,400.00 <br />Lump <br />C. <br />12-Hour Traffic Counts <br />Sum <br />d. <br />I Design and Plans for the Two -Way Conversion of Colfax Avenue Including: <br />i) <br />Two -Way Conversion of W. Lasalle Avenue, Realignment of W. Lasalle <br />$6,900.00 <br />Lump <br />Avenue, and Visitor Parking Lot <br />Sum <br />$3,900.00 <br />Lump <br />ii) <br />Two -Way Conversion of Colfax Avenue <br />Sum <br />$6,900.00 <br />Lump <br />iii) <br />Street Improvements along Elm Street <br />Sum <br />$ S, 700.00 <br />Lump <br />e. <br />Building Demolition (as directed by Owner) <br />Sum <br />2 of 4 <br />Supplemental Agreement No. 1 <br />