Laserfiche WebLink
SUPPLEMENTAL AGREEMENT NO. 1 <br />This Supplemental Agreement No. 1 is made and entered into this N <br />day of dC'N, 20 <br />by and between the City of South Bend, Indiana, acting by and through the Board of Public Works, <br />hereinafter referred to as the "Owner", and DLZ Indiana, LLC, 2211 East Jefferson Blvd., South Bend, IN <br />46615, hereinafter referred to as the "Engineer". <br />WITNESSETH <br />WHEREAS, the Owner and Engineer did, on February 28, 2017 enter into an agreement for the <br />preparation of construction documents for the construction of the Colfax Avenue Two -Way Conversion. <br />WHEREAS, during the course of design, certain additional services not included in the original <br />contract dated February 28, 2017, have become necessary; specifically: <br />• Additional topographic survey at the intersection of Colfax Avenue and LaPorte <br />Avenue. <br />• Design of bumpouts along the curb in each of the four approaches of the Colfax <br />Avenue and LaPorte Avenue Intersection. <br />• Alignment and parking lot study for LaSalle Avenue <br />NOW THEREFORE, the Owner and the Engineer desire to amend the above referenced Design <br />Contract as follows: <br />I. Delete Exhibit A.I. and replace with the attached exhibit: <br />(Exhibit A.1. has been revised to show the additional topographic survey limits required to design <br />bumpouts at the intersection of Colfax Avenue and LaPorte Avenue. The survey shall extend for <br />a distance of 150 feet from the center of the intersection along each of the four approaches). <br />II. Delete item A 2 d from Section Al 02 in Exhibit A in its entirety and replace with the following <br />d. Traffic Signal Removal <br />1) The Engineer shall design the installation of stop signs at the intersection of Colfax <br />Avenue with LaPorte Avenue using Owner's standards. Specifications for use in bidding <br />and an opinion of probable construction cost shall be prepared. it is assumed that no <br />lane additions or roadway widening will be required to accommodate two-way traffic <br />or turn lanes. <br />III. Add Sub -Section A.13. to Section A1.02 of Exhibit A as follows: <br />13. Intersection Improvement of Colfax Avenue and LaPorte Avenue including (See Exhibit <br />A.1. j: <br />a. The Engineer shall develop a conceptual plan for adding bumpouts in each of the four <br />quadrants of the intersection, including sidewalk and pavement marking <br />modifications. Development of the conceptual plan shall also include adding the <br />conceptual plan to the plan set, which will be presented at the public open house. <br />1 of 4 <br />Supplemental Agreement No. 1 <br />