My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - McCormick Engineering - Southfield Lake Drainage Study
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - McCormick Engineering - Southfield Lake Drainage Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:45:04 AM
Creation date
8/23/2017 1:49:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. The total estimated compensation for Engineer's services included in the breakdown by <br />phases as noted in Paragraph C2.01.A.3 incorporates all labor, overhead, profit, <br />Reimbursable Expenses and Engineer's Consultants' charges. <br />6. The amounts billed for Engineer's services under Paragraph C2.01 will be based on the <br />cumulative hours charged to the Project during the billing period by each class of <br />Engineer's employees times Standard Hourly Rates for each applicable billing class, plus <br />Reimbursable Expenses and Engineer's Consultants' charges. <br />7. The Standard Hourly Rates and Reimbursable Expenses Schedule will be adjusted annually <br />(as of January 1 _) to reflect equitable changes in the compensation payable to Engineer. <br />C2.02 Conylensation For Reimbursable Expenses <br />A. Owner shall pay Engineer for all Reimbursable Expenses at the rates set forth in Appendix 1 to <br />this Exhibit C. <br />B. Reimbursable Expenses include the following categories: transportation and subsistence <br />incidental thereto; providing and maintaining field office facilities including furnishings and <br />utilities; toll telephone calls and mobile phone charges; reproduction of repotls, Drawings, <br />Specifications, Bidding Documents, and similar Project -related items in addition to those required <br />under Exhibit A. In addition, if authorized in advance by Owner, Reimbursable Expenses will also <br />include expenses incurred for the use of highly specialized equipment. <br />C. The amounts payable to Engineer for Reimbursable Expenses will be the Project -related internal <br />expenses actually incurred or allocated by Engineer, plus all invoiced external Reimbursable <br />Expenses allocable to the Project, the latter multiplied by a factor of 1.0 <br />C2.03 Other Provisions Concerning Payment <br />A. Whenever Engineer is entitled to compensation for the charges of Engineer's Consultants, those <br />charges shall be the amounts billed by Engineer's Consultants to Engineer times a factor of <br />1.0 <br />B. Factors. The external Reimbursable Expenses and Engineer's Consultants' factors include <br />Engineer's overhead and profit associated with Engineer's responsibility for the administration of <br />such services and costs. <br />Page 2 <br />Exhibit C—Compensation Packet BC-2: Basic Services (other than RPR)— Standard Hourly Rates Method of Payment <br />EJCDC E-50OAgreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.