My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - McCormick Engineering - Southfield Lake Drainage Study
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - McCormick Engineering - Southfield Lake Drainage Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:45:04 AM
Creation date
8/23/2017 1:49:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of 6 pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated Aug 22, 2016. <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-2: Basic Services — Standard Hourlv Rates <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Cornpensation For Basic Services (other than Resident Project Representative) — Standard Hourly <br />Rates Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer's Resident Project Representative, if any, as follows: <br />1. An amount equal to the cumulative hours charged to the Project by each class of Engineer's <br />personnel times Standard Hourly Rates for each applicable billing class for all services <br />performed on the Project, plus Reimbursable Expenses and Engineer's Consultants' charges, <br />if any. <br />2. Engineer's Reimbursable Expenses Schedule and Standard Hourly Rates are attached to this <br />Exhibit C as Appendices I and 2. <br />3. The total compensation for services under Paragraph C2.01 is estimated to be $39,370 <br />based on the following estimated distribution of compensation: <br />a. Study and Report Phase <br />b. Preliminary Design Phase <br />c. Final Design Phase <br />d. Bidding or Negotiating Phase <br />e. Construction Phase <br />f Post -Construction Phase <br />$ 39 370 <br />$ NIA <br />$ NIA <br />$ NIA <br />$ NIA <br />$ NIA <br />4. Engineer may alter the distribution of compensation between individual phases of the work <br />noted herein to be consistent with services actually rendered, but shall not exceed the total <br />estimated compensation amount unless approved in writing by Owner. See also C2.03.C.2 <br />below. <br />Page l <br />Exhibit C—Compensation Packet BC-2: BasicServioes(other than RPR)—Standard Hourly Rates Method of Payment <br />EJCDC E-50OAgreement Between Owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.