My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Marriott Hotel Site Development at Hall of Fame, Phase 3 Project No. 117-064 - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Marriott Hotel Site Development at Hall of Fame, Phase 3 Project No. 117-064 - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 9:46:22 AM
Creation date
8/23/2017 1:14:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REVISION 2 <br />32 <br />No. 4 Wire <br />358 <br />LFT <br />$3.85 <br />$1,378.30 <br />33 <br />Bollards, Decorative <br />7 <br />EACH <br />$1,700.00 <br />$11,900.00 <br />34 <br />Bollards, Standard <br />6 <br />EACH <br />$800.00 <br />$4,800.00 <br />35 <br />Trash Enclosure <br />1 <br />LS <br />$45,000.00 <br />$45,000.00 <br />36 <br />Parking Lot Signs <br />6 <br />EACH <br />$140.00 <br />$840.00 <br />37 <br />Sign Post <br />58 <br />LFT <br />$13.00 <br />$754.00 <br />38 <br />Line, Thermoplastic, Stop Bar, 24 IN <br />23 <br />LFT <br />$25.00 <br />$575.00 <br />39 <br />Line, Epoxy, Solid, Blue, 4 IN <br />65 <br />LFT <br />$5.00 <br />$325.00 <br />40 <br />Line, Epoxy, Solid, White, 4 IN <br />395 <br />LFT <br />$5.00 <br />$1,975.00 <br />41 <br />Pavement Message Marking, Epoxy, Handicap <br />Symbol <br />1 <br />EACH <br />$300.00 <br />$300.00 <br />42 <br />Pavement Message Marking, Thermoplastic, Do Not <br />Enter <br />1 <br />EACH <br />$500.00 <br />$500.00 <br />43 <br />Flagpole, 25` <br />1 <br />EACH <br />$2,500.00 <br />$2,500.00 <br />44 <br />Flagpole, 20' <br />2 <br />EACH <br />$1,800.00 <br />$3,600.00 <br />45 <br />Shrub, No. 3 Container <br />29 <br />EACH <br />$75.00 <br />$2,175.00 <br />46 <br />Ornamental Grass, No. 1 Container <br />44 <br />EACH <br />$30.00 <br />$1,320.00 <br />47 <br />Nursery, Sodding and Topsoil <br />101 <br />SYS <br />$1.6.00 <br />$1,616.00 <br />48 <br />Hardwood Mulch, 3 IN <br />6 <br />CYS <br />$90.00 <br />$540.00 <br />49 <br />Maintaining Traffic <br />1 <br />LS <br />$8,500.00 <br />$8,500.00 <br />BASE BID PART C BID TOTAL: $499,273.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.