REVISION 2
<br />BASE BID PART C (Derue Court and Hotel Site)
<br />Item No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Construction Engineering
<br />1
<br />LS
<br />$3,000.00
<br />$3,000.00
<br />2
<br />Video Record
<br />1
<br />LS
<br />$500.00
<br />$500.00
<br />3
<br />Inspection Hole
<br />2
<br />EACH
<br />$500.00
<br />$1,000.00
<br />4
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />$40,000.00
<br />$40,000.00
<br />5
<br />Clearing of Right of Way
<br />1
<br />LS
<br />$15,000.00
<br />$15,000.00
<br />6
<br />Structure, Remove
<br />2
<br />EACH
<br />$1,500.00
<br />$3,000.00
<br />7
<br />Pipe, Abandon
<br />83
<br />LFT
<br />$35.00
<br />$2,905.00
<br />8
<br />Excavation, Common
<br />263
<br />CYS
<br />$125.00
<br />$32,875.00
<br />9
<br />Temporary Erosion Control
<br />1
<br />LS
<br />$5,000.00
<br />$5,000.00
<br />10
<br />Temporary Inlet Protection
<br />7
<br />EACH
<br />$300.00
<br />$2,100.00
<br />11
<br />Surface Milling, Asphalt
<br />672
<br />SYS
<br />$12.00
<br />$8,064.00
<br />12
<br />HMA Patching, Type A
<br />37
<br />TON
<br />$250.00
<br />$9,250.00
<br />13
<br />HMA Surface
<br />55
<br />TON
<br />$225.00
<br />$12,375.00
<br />14
<br />Compacted Aggregate, No 53
<br />652
<br />TON
<br />$53.00
<br />$34,556.00
<br />15
<br />Sidewalk, PCCP, 5 IN
<br />387
<br />SYS
<br />$45.00
<br />$17,415.00
<br />16
<br />Sidewalk, Decorative, 5 IN
<br />75
<br />SYS
<br />$85.00
<br />$6,375.00
<br />17
<br />Sidewalk, PCCP, Radiant
<br />226
<br />SYS
<br />$100.00
<br />$22,600.00
<br />18
<br />Concrete, PCCP, Reinforced, 6 IN
<br />1120
<br />SYS
<br />$65.00
<br />$72,800.00
<br />19
<br />Concrete, PCCP, Reinforced, Colored, 6 IN
<br />165
<br />SYS
<br />$85.00
<br />$14,025.00
<br />20
<br />Curb Ramp, Concrete
<br />35
<br />SYS
<br />$200.00
<br />$7,000.00
<br />21
<br />Standard Curb, Concrete
<br />868
<br />LFT
<br />$40.00
<br />$34,720.00
<br />22
<br />Storm Sewer Pipe, 24 IN, Perforated
<br />120
<br />LFT
<br />$75.00
<br />$9,000.00
<br />23
<br />Storm Sewer Pipe, 12 IN
<br />13
<br />LFT
<br />$145.00
<br />$1,885.00
<br />24
<br />Drywell, 6 FT Diameter
<br />3
<br />EACH
<br />$7,500.00
<br />$22,500.00
<br />25
<br />Storm Trench, INDOT No. 8 Aggregate
<br />80
<br />CYS
<br />$130.00
<br />$10,400.00
<br />26
<br />Geotextile Fabric
<br />6864
<br />SFT
<br />$1.00
<br />$6,864.00
<br />27
<br />Light Standard, Type C
<br />2
<br />EACHI
<br />$2,000.00
<br />$4,000.00
<br />28
<br />Light Standard, TypeD
<br />1
<br />EACH
<br />$1,900.001
<br />$1,900.00
<br />29
<br />Light Standard, Type E
<br />2
<br />EACH
<br />$2,100.00
<br />$4,200.00
<br />30
<br />Light Pole Foundation
<br />3
<br />EACH
<br />$1,000.00
<br />$3,000.00
<br />31
<br />Conduit, PVC, Schedule 80, 2 IN
<br />338
<br />LFT
<br />$7.00
<br />$2,366.00
<br />Version 10/17/2016 Contractor's Bid for Public Works - 10