My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Donohue & Assoc. - South Well Field Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Donohue & Assoc. - South Well Field Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:36:23 AM
Creation date
8/9/2017 3:11:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT A, consisting of 5 pages, referred to in and <br />part of the Agreement between Owner and Engineer for <br />Professional Services dated August 8 , 2017. <br />Engineer's Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Services as set forth below. <br />PART 1— SERVICES <br />PROJECT DESCRIPTION <br />The 2017 South Well Field, Water Treatment Plant & Pressure District Improvements project (Project) will <br />include improvements to the existing South Well Field (WF), South Water Treatment Plant (WTP) and <br />water distribution network that will result in a direct interconnection to the South Pressure District. This <br />new connection, direct from South Well Field, will provide a new source of water to the South Pressure <br />District, redundant to the single current source which occurs via the Fellows Booster Station. <br />In addition to the new interconnection, the project will also include improvements to the South WF and <br />WTP that will support the new operational requirements associated with the direct connection to the South <br />Pressure District, as well as other needed upgrades and improvements to the WTP and its processes. <br />During project scoping meetings held with OWNER representatives on April 11, 2017, July 2I, 2017 and <br />July 27, 2017, it was determined that the project will start with a Needs Assessment of the existing South <br />WF and WTP, including the wells, well pumps, treatment and mechanical systems), as well as the <br />distribution infrastructure and systems supplying the South Pressure District. The purpose of the Needs <br />Assessment will be to identify options and recommendations for the improvements that will be required to <br />provide water from South WF and WTP direct to the South Pressure District. The Needs Assessment may <br />also identify other current deficiencies, issues and associated improvements that will result in optimization <br />and improved operations of South WF and WTP. <br />Work performed toward the Project will proceed with Task Orders approved by the OWNER, starting with <br />the Needs Assessment and Distribution System Modeling (scopes for Task Order Nos. l and 2 identified in <br />Sections B and C, respectivelX, under the "Engineering Services" portion of this `Exhibit A'). Following <br />the finalization of the Needs Assessment (and completion of Task Order Nos. 1 and 2) and given its <br />recommendations, the ENGINEER will develop additional Task Orders for approval by the OWNER, and <br />subsequent completion as needed throughout the completion of this Project. <br />Exhibit A, Engineer's Services <br />EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright 02009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.