My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Donohue & Assoc. - South Well Field Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Donohue & Assoc. - South Well Field Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:36:23 AM
Creation date
8/9/2017 3:11:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGINEERING SERVICES <br />A. PROJECT MANAGEMENT <br />1. ENGINEER shall provide project management services throughout the entirety of the <br />project to monitor the budget and schedule, while maintaining open and consistent <br />communications with the OWNER's designated project representative. <br />2. Project management services will be provided for the overall project with identification and <br />specific reference to each Task Order. <br />3. Project management services shall include: <br />a. Status reports provided to the OWNER on a monthly basis. <br />b. Project schedule updates delivered to the OWNER on a regular basis. <br />C. Project Management phone conferences between the ENGINEER and OWNER <br />twice per month for the duration of the project. <br />B. TASK ORDER NO. I — NEEDS ASSESSMENT <br />1. ENGINEER shall prepare a Needs Assessment document that will identify potential <br />improvement options to the existing South WF, WTP and water distribution system that <br />will allow the South WTP to provide potable water directly to the City of South Bend's <br />South Pressure District via a new distribution system interconnection. <br />2. The Needs Assessment will include: <br />a. Determination of future South WF and WTP production and distribution <br />requirements, given a new direct feed to the South Pressure District. <br />b. Feasibility analysis of utilizing the existing South WF wells and pumps for the <br />identified future distribution requirements. Analysis will also take into consideration <br />the following: <br />i. Potential changes in raw water composition. <br />ii. Influence of the increased pumpage on the groundwater. <br />C. Feasibility analysis of utilizing the existing South WTP for the identified future <br />distribution requirements. Analysis will also take into consideration the following: <br />i. Ability of existing GAC units to treat future pumping requirements. <br />ii. Chemical treatment capabilities, including alternative treatment systems. <br />iii. Contact time requirements and potential issues with direct feed into the <br />distribution network without use of a clearwell or tank. <br />iv. Safety concerns associated with increased chemical usage. <br />d. Identification of up to two (2) alternatives in lieu of utilizing the existing wells for <br />water production to be distributed in to the South Pressure District. <br />EWhit A, Engineer's Services <br />EJCDC E-520 Short Farm of Agreement Between Owner and Engineer for Professional Services. <br />Copyright 02009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.