PSA - Lawson Fisher Associates - Ironwood Road Pavement Restoration Survey and Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:43:29 AM
Creation date
7/27/2017 8:28:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J. The Engineer shall maintain sufficient records to accurately track the status of utility relocations <br />and ensure that work is done on schedule in an organized timely manner and prepare periodic <br />status reports. <br />K. The Engineer shall determine if a Utility Field Check is needed, then schedule and conduct the <br />Field Check as may be directed by the Owner. <br />L. The Engineer shall utilize Subsurface Utility Engineering (SUE) locating and designating <br />information when investigating utility conflicts, as may be requested by the Owner. <br />A1.06 Bid Period Services <br />A. After acceptance by Owner of the Bidding Documents and the most recent opinion of probable <br />Construction Cost as determined in the Final Plans, and upon written authorization by Owner to <br />proceed, Engineer shall: <br />1. Assist Owner in advertising for and obtaining bids or proposals for the Work and, where <br />applicable, maintain a record of prospective bidders to whom Bidding Documents have been <br />issued, attend a mandatory pre -Bid conferences for each project. <br />2. Issue Addenda as appropriate to clarify, correct, or change the Bidding Documents. <br />3. Consult with Owner as to the acceptability of subcontractors, suppliers, and other individuals <br />and entities proposed by prospective contractors for those portions of the Work as to which such <br />acceptability is required by the Bidding Documents. <br />4. Maintain a record of questions and responses provided through bid period to be issued by <br />addenda to prospective bidders to whom Bidding Documents have been issued. <br />5. Attend the Bid opening, prepare Bid tabulation sheets, and assist Owner in evaluating Bids or <br />proposals and in assembling and awarding contracts for the Work. <br />B. The Bid Period Services Phase will be considered complete upon commencement of the <br />Construction Phase or upon cessation of negotiations with prospective contractors (except as may <br />be required if Exhibit F is a part of this Agreement). <br />A1.07 Construction Phase Services <br />A. Following the award of the construction Contract, the Engineer will be responsible for attending <br />the pre -construction meeting. During the course of construction, the Engineer shall be available at <br />reasonable times during normal working hours to respond to reasonable inquiries concerning the <br />accuracy or intent of the Engineer's plans. All such inquiries shall be made only by persons <br />designated by the Owner to interpret the plans and Contract documents for the benefit of the <br />contractors and subcontractors performing the work. The Engineer shall not be required to respond <br />to inquiries by persons other than Owner's designated representative -- hereafter referred to as the <br />Construction Engineer -- and shall not be required to engage in exhaustive or extensive analysis <br />or interpretation of the plans. <br />-- ----- - -- Page 7 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Behveen Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />