My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Seitz River Wall Solar Light Upgrade - KW Construction Services LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Quotations - Seitz River Wall Solar Light Upgrade - KW Construction Services LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:54:19 PM
Creation date
7/26/2017 2:40:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QLIOte: SB16-4'1755-1 ' <br />ESL .4^_j �J F- <br />S...f ESL -Spectrum -South fend <br />115 S. Main St Page 1 /1 <br />Mishawaka IN 46544 <br />Date: Nov 4, 2016 Phone: (574) 265-2151 <br />Fax: (574) 255-5919 <br />Project South Bend Parks and Recs - Solar for From: Steve Clearwater <br />River Wall <br />Location <br />(quote S1316-41755-1 <br />To: For <br />Sid Date Nov 3, 2016 <br />Expires Dec 3, 2016 <br />QTY Tvtoe MFG Part <br />5 <br />EMBER <br />VWP-L8-525-PG-VS WALL PACK 1,690 LUMENS <br />1 <br />EMBER <br />EPS-C-2-069 ESHINE POWER SYSTEM <br />1 <br />EMBER <br />EPOLE-Sl-20-GAL ESHINE SOLAR POLE <br />1 <br />EMBER <br />EPAINT-FPC-Sl-20 EPOLE POWDER COATING <br />PLUS FREIGHT <br />Terms and conditions of sale: <br />1. Pricing Is based on above counts and complete bill of material. Any changes will <br />require a new quotation. <br />2. Pricing Is firm for 30 days from date of quotation and release of order within 60 days <br />from date of quotation. <br />3. Subject to manufacturer s published terms and conditions of sale. Standard warranties <br />apply unless otherwise noted. <br />4. Prices 00 NOT include lamps, spare material, fuses, special finishes, mounting <br />devices, installation or applicable taxes unless otherwise noted. <br />5. ESL -Spectrum will NOT be responsible for errors resulting on orders released without <br />receipt of signed approval drawings or errors missed in the approval process. <br />6. Pre -shipment of anchor bolts is available and will be plus freight. <br />7. Freight Is not included on the order unless otherwise noted. <br />8. The purchaser Is responsible for verifying voltage, quantities, and if multiple ballasts are <br />required for dual level switching. Final ballast type, configuration and switching shall be <br />coordinated with electrical contractor prior to release of order If there are differences <br />between the fixture schedule and electrical drawings. <br />115 S. Main St. Suite 204 Mishawaka, IN 46544 Ph: 574.266.2151 Fax: 674-255.5919 Steve Clearwater Page Ill <br />
The URL can be used to link to this page
Your browser does not support the video tag.