Laserfiche WebLink
Change Order No. 01 <br />Western Avenue Corridor Improvements <br />Project No. 115-097 <br />B. Additions <br />10. The removal of concrete pavements not designated on plans for concrete pavement removal <br />will be paid for as common excavation unless otherwise noted. <br />LXX. TEMPORARY LIGHTING <br />B. Additions <br />3. On July 26, 2017, the Contractor shall assume responsibility for maintaining the temporary <br />lighting until permanent lighting is in place. The Contractor shall turn temporary lights on in the <br />evening and off in the morning. The Contractor shall be responsible for fueling the lights, In the <br />event that South Bend Traffic and Lighting needs to remove the temporary lighting, the <br />Contractor shall be responsible for procuring replacement temporary lighting at their cost. <br />DRAWINGS: <br />The following sheets have been revised and are issued as new sheets as a part of this Change Order: <br />NO CHANGE <br />END CHANGE ORDER 1 <br />SHEET 3 OF 3 <br />