My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Selge Construction Co., Inc. - Western Avenue Corridor Improvements Project No 115-097
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 1 - Selge Construction Co., Inc. - Western Avenue Corridor Improvements Project No 115-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:54:11 PM
Creation date
7/26/2017 2:17:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 01 <br />Western Avenue Corridor Improvements <br />Project No. 115-097 <br />B. Additions <br />10. The removal of concrete pavements not designated on plans for concrete pavement removal <br />will be paid for as common excavation unless otherwise noted. <br />LXX. TEMPORARY LIGHTING <br />B. Additions <br />3. On July 26, 2017, the Contractor shall assume responsibility for maintaining the temporary <br />lighting until permanent lighting is in place. The Contractor shall turn temporary lights on in the <br />evening and off in the morning. The Contractor shall be responsible for fueling the lights, In the <br />event that South Bend Traffic and Lighting needs to remove the temporary lighting, the <br />Contractor shall be responsible for procuring replacement temporary lighting at their cost. <br />DRAWINGS: <br />The following sheets have been revised and are issued as new sheets as a part of this Change Order: <br />NO CHANGE <br />END CHANGE ORDER 1 <br />SHEET 3 OF 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.