Laserfiche WebLink
Change Order No. 01 <br />Western Avenue Corridor Improvements <br />Project No. 115-097 <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />Bid/Proposal Form: <br />NO CHANGE <br />SPECIFICATIONS: <br />The following special provisions have been amended or added to the Contract Documents and are issued <br />as part of this Change Order: <br />XIII. PROSECUTION AND PROGRESS <br />B. Additions <br />3. The project will have intermediate completion dates as listed in the table below for substantial <br />completion: <br />Phase I & 11: Kaley Street and Meade Street Sewer and Water Crossings — June 30, 2017 <br />Phase III: South Side Improvements — August 31, 2017 <br />Phase IV: North Side Improvements — October 10, 2017 <br />Phase V: Fixtures, Trees, Fencing, and Landscaping — October 13, 2017 <br />a. The project will have an intermediate substantial completion date of June 30, 2017 for <br />storm sewer to be constructed from the intersection of Western Avenue and Kaley Street to <br />its northern connection on Kaley Street and for water crossings at Meade Street and at <br />Kaley Street, A minimum of one travel lane and one parking lane along Western Avenue <br />shall be open to traffic during the lane closure. <br />b. The project will have an intermediate substantial completion date of August 31, 2017 for <br />construction of curb, sidewalk, roadway, lighting, pavers, and all project elements complete <br />and in -place on the southern side of the roadway centerline except for pavement markings, <br />benches, bike racks, landscaping, and trees. A minimum of one travel lane and one parking <br />lane along Western Avenue shall be open to traffic during the lane closure period. <br />Temporary parking lane closures will be permitted for water service connections. Phase III <br />of the project can occur simultaneously with Phase II, provided that the contractor maintains <br />a minimum of one travel lane along Western Avenue and submits a revision to the <br />Maintenance of Traffic Plan that is approved by the City prior to construction. <br />c. The project will have an intermediate substantial completion date of October 10, 2017 for <br />construction of curb, sidewalk, roadway, lighting, pavers, pavement markings, and all <br />project elements complete and in -place on the north side of the roadway centerline except <br />for benches, bike racks, landscaping, and trees. A minimum of one travel lane and one <br />parking lane along Western Avenue shall be open to traffic during the lane closure period. <br />d. The project will have an intermediate substantial completion date of October 13, 2017 for <br />installation of benches, bike racks, landscaping, fencing, and trees. A minimum of two travel <br />lanes on Western Avenue shall be open to traffic during the lane closure period. <br />XXX. CONCRETE PAVEMENT REMOVAL <br />SHEET 2 OF 3 <br />