My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07112017 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2017
>
07112017 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:34:12 PM
Creation date
7/25/2017 1:07:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />JULY 11, 2017 210 <br />for one set of lifts,- N/A — Adjustable Forks <br />Estimated Number of Days for Delivery from Award: 45 days <br />SLEC, INC. <br />23 Fontana Lane, Suite 109 <br />Baltimore, MO 21237 <br />Bid was signed by: Jamie Pedrick <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Security Check was submitted. <br />:W <br />Description <br />Year/Make/Model <br />Unit Price <br />SLEC <br />2017/SLEC/18 Type/ Set of 6 - <br />#911017 <br />$38,463 <br />Alternate # <br />Description <br />Cost <br />Total <br />1 <br />Any adaptors needed for lifting <br />smaller vehicles — set of 4 <br />$595 <br />$595 <br />Estimated Number of Days for Delivery from Award: 2-4 weeks <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were <br />referred to Central Services for review and recommendation. <br />OPENING OF QUOTATIONS — LED LUMINAIRES — PROJECT NO 117-078 (COIT) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotation was opened and read: <br />ALL PHASE ELECTRIC SUPPLY <br />1385 N. Bendix Drive <br />South Bend, IN 46628 <br />Quotation was submitted by Larry Futa <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />QUOTATION: $63,000.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above quotation <br />was referred to Engineering and Traffic and Lighting for review and recommendation. <br />OPENING OF QUOTATIONS — UNITY GARDENS SITE DEVELOPMENT — PROJECT NO <br />117-050 (RWDA TIF) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotation was opened and read: <br />RITSCHARD BROS., INC. <br />1204 W Sample Street <br />South Bend, IN 46619 <br />Quotation was submitted by Rachelle Dolniak <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />QUOTATION: $125,800.00 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.