1. Prepare Preliminary Design Phase documents consisting of construction documents at <br />20% and 60% design including final design criteria, preliminary drawings, outline <br />specifications, and written descriptions of the Project. The design will include two <br />approaches as outlined above through the 20% design level with opinions of probably <br />construction cost. A preferred alternative will be selected after review and discussion with <br />the Owner and the discarded alternative will be dismissed. <br />2. Provide necessary field surveys and topographic and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners. <br />3. Obtain three pavement cores and soil borings a minimum of five foot depth. <br />4. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />5. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />6. Perform or provide the following additional Preliminary Design Phase tasks or <br />deliverables: <br />a, Design Review Meetings <br />7. Furnish 3 review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner within 60 calendar days of authorization to proceed with this phase, <br />and review them with Owner. Within 10 calendar days of receipt, Owner shall submit to <br />Engineer any comments regarding the Preliminary Design Phase documents and any other <br />deliverables. <br />S. Revise the Preliminary Design Phase documents and any other deliverables in response to <br />Owner's comments, as appropriate, and furnish to Owner 3 copies of the revised <br />Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br />any other deliverables within 30 calendar days after receipt of Owner's comments. <br />B. Engineer's services under the Preliminary Design Phase will be considered complete on the date <br />when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />A1.03 Final Design Phase <br />A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost as determined in the Preliminary Design Phase, and any other <br />deliverables subject to any Owner -directed modifications or changes in the scope, extent, <br />character, or design requirements of or for the Project, and upon written authorization from <br />Owner, Engineer shall: <br />Page 2 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />