Laserfiche WebLink
REGULAR MEETING <br />JUNE 27, 2017 198 <br />South Bend, IN 46628 <br />Quotation was submitted by John Martell <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />QUOTATION: $6,535.00 <br />MICHIANA CONTRACTING, INC <br />7843 Lilac Road <br />PO Box 929 <br />Plymouth, IN 46563 <br />Quotation was submitted by Scott Kirkpatrick <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />QUOTATION: $8,980.00 <br />Upon a motion made by Ms. Dorau, seconded by Mr. Mueller and carried, the above Quotations <br />were referred to Engineering for review and recommendation. <br />AWARD BID — ONE (1) OR MORE 2017 OR NEWER 40' ARTICULATING BOOM LIFT — <br />SPEC R (SUBJECT TO VPA CAPITAL LEASE) <br />Mr. Jeff Hudak, Central Services, advised the Board that on June 13, 2017, bids were received <br />and opened for the above referenced equipment. After reviewing those bids, Mr. Hudak <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />MacAllister Machinery Company, 7515 East 301h Street, Indianapolis, Indiana, 46219, in the <br />amount of $45,500. Therefore, Ms. Dorau made a motion that the recommendation be accepted <br />and the bid be awarded as outlined above. Mr. Mueller seconded the motion, which carried. <br />AWARD BID — CENTURY CENTER MASONRY RESTORATION — PROJECT NO. 117-037 <br />(HOTEL/MOTEL TAXI <br />Ms. Tara Weigand, Engineering, advised the Board that on June 13, 2017 bids were received and <br />opened for the above referenced project. After reviewing those bids, Ms. Weigand recommended <br />that the Board award the contract to the lowest responsive and responsible bidder Ziolkowski <br />Construction, Inc., 4050 Ralph Jones Drive, South Bend, IN 46628, in the amount of $157,078. <br />Therefore, Ms. Dorau made a motion that the recommendation be accepted and the bid be <br />awarded as outlined above. Mr. Mueller seconded the motion, which carried. <br />AWARD BID — EDISON AND IRONWOOD ROAD CORRIDOR REHABILITATION — <br />PROJECT NO. 116-070 (LOCAL ROAD &B'RIDGE MATCHING GRANT) <br />Mr. Kevin Fmk, Engineering, advised the Board that on June 13, 2017, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Fink recommended that <br />the Board award the contract to the lowest responsive and responsible bidder Rieth-Riley <br />Construction Co., Inc., 25200 State Road 23, South Bend, IN 46614, in unit prices not to exceed <br />the amount of $1,399,624.80. Therefore, Ms. Dorau made a motion that the recommendation be <br />accepted and the bid be awarded as outlined above. Mr. Mueller seconded the motion, which <br />carried. <br />AWARD BID — THIRTY-NINE (39)MORE OR LESS 2017 OR NEWER ALL WHEEL <br />DRIVE POLICE PATROL VEHICLES — SPEC E (SUBJECT TO POLICE CAPITAL LEASE) <br />Mr. Jeff Hudak, Central Services, advised the Board that on May 23, 2017, bids were received <br />and opened for the above referenced vehicles. After reviewing those bids, Mr. Hudak <br />recommended that the Board award the contract to the second lowest, responsive and responsible <br />bidder, Wade Ford, Inc., 3860 South Cobb Drive, Smyrna, GA 30080, in the amount of $24,978 <br />each, total of $974,142. In his memo, Mr. Hudak noted the low bidder, Bloomington Ford, did <br />not submit a bid security with their bid and is therefore, non -responsive to the bid specs. The <br />Board discussed the award of the CNG alternate. Ms. Dorau stated the Board was told the order <br />needed to be placed to avoid missing the deadline, and the alternates can be decided on later. <br />Lieutenant Chris Voros, Police Department, stated they had decided against the CNG on this <br />C <br />L_ <br />1 <br />