My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos. 10, 11, 12 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order Nos. 10, 11, 12 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:59:12 PM
Creation date
6/15/2017 9:15:51 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notes: <br />Change Order No. 12 addresses "Request for Proposal No. 3" which the City requested pricing <br />for after Arcadis U.S. completed the design effort previously approved by the Board of Public <br />Works. The cost for this proposal includes value engineering costs from by Thieneman <br />Construction in conjunction with the proposal pricing supplied for Change Order No. 12. This <br />proposal was requested as an additional scope of work. The Aeration Gallery Deck had <br />originally been omitted from the project as a cost saving measure during design. Low costs <br />during bidding provided an opportunity to address safety and access deficiencies while the <br />General Contractor is mobilized and performing work at the Aeration Gallery. The resultant <br />effort results in an increase in costs and will providing better access to the Aeration Gallery, <br />Aeration Tanks 1-4 and Final Clarifiers 1-5. <br />The funding sources for the construction of this project are the 2012 Sewer Bond (661-0630- <br />415-42-06) and Wastewater Equipment Purchases / Treatment and Disposal (642-0630-415-43- <br />66). This approval is subject to a 3rd Quarter Appropriation that will move bond funds from <br />Sewer to Wastewater Treatment Plant for the purposes of paying a portion of Change Order No. <br />12. The expected split is $78,742.04 from the 2012 Sewer Bond and $404,668.96 from the <br />Wastewater Equipment Purchases / Treatment and Disposal Account. If there are questions <br />regarding the subject change order, please contact Al Greek (Ext. 4210) or Jacob M. Klosinski <br />(Ext. 9496) at the Division of Utilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.