My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos. 10, 11, 12 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order Nos. 10, 11, 12 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:59:12 PM
Creation date
6/15/2017 9:15:51 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF UTILITIES <br />TO: Members of the Board of Public Works <br />Eric Horvath, Director of Public Works <br />Michael Schmidt, Board of Public Works Attorney <br />FROM: Al Greek, Director of Utilities <br />Jacob M. Klosinski, Assistant City Engineer <br />SUBJECT: Agenda Request Form — Change Order No. 12 <br />Project No. 114-053: Wastewater Treatment Plant Secondary Treatment <br />Improvements <br />DATE: June 6, 2017 <br />The Division of Utilities is requesting the Board of Public Works approval of Change Order No. <br />12 for Project No. 1144-053 Wastewater Treatment Plant Secondary Treatment Improvements. <br />Refer to attached documents for supporting details for the subject work. <br />Change Order No. 12 addresses the following changes: <br />Demolition of Concrete Walkways <br />Demolition of Containment Area at the south end of Aeration <br />New Concrete Aeration Gallery Decking <br />New Aeration Gallery Handrail to replace obsolete and damaged rails <br />New Hatches for Aeration Gallery 1 Tunnel Access <br />Access Step Modifications for Gallery #1, #2 and #3 (WWTP Buildings #8, #9, and #10) <br />Concrete Coatings and Coating Touch-up <br />Electrical Relocations for Lighting and Receptacles <br />Concrete Slab -on -Grade at south end of Aeration 1 Secondary Treatment for Vehicle Access <br />NET INCREASE FOR CHANGE ORDER NO. 12 ITEMS $483,411.00 <br />Original Contract Sum $11,885,000.00 <br />Net change by previously authorized change orders $ 1,615,234.87 <br />The contract sum prior to this change order $13,500,234,87 <br />By this change order, the project amount increases by $ 483,411.00 <br />The new contract sum including this change order is $13,983,645.87 <br />This Change Order represents a total change of +4.07% <br />Total change for the entire project +17.66% <br />Time Extensions resulting from Change Order No. 9: <br />Substantial Completion: +30 days <br />Final Completion: +30 days <br />
The URL can be used to link to this page
Your browser does not support the video tag.