My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos. 10, 11, 12 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order Nos. 10, 11, 12 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:59:12 PM
Creation date
6/15/2017 9:15:51 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#3 above), as the reduced staff time for RFP #3 adder may be offset by late release delay <br />costs. <br />In the meantime the owner has acknowledged that we are removing access ways <br />associated with RFP #2, and has stated that they will provide means for temporary access <br />of plant personnel until our replacement metals can be fabricated and installed. <br />Sigw'gasteele <br />C <br />Contract Manager <br />Cc: Jacob Klosinski, City of South Bend <br />File <br />INDUSTRIAL • MUNICIPAL CONTRACTOR <br />521 W. 84th Drive •Merrillville, IN 46410.219-9474700 + Fax 219-947-4711 <br />17219 Foundation Pkwy . Westfield, IN 46074 . 317-867-3462 • Fax 317-867-3463 <br />
The URL can be used to link to this page
Your browser does not support the video tag.