Laserfiche WebLink
#3 above), as the reduced staff time for RFP #3 adder may be offset by late release delay <br />costs. <br />In the meantime the owner has acknowledged that we are removing access ways <br />associated with RFP #2, and has stated that they will provide means for temporary access <br />of plant personnel until our replacement metals can be fabricated and installed. <br />Sigw'gasteele <br />C <br />Contract Manager <br />Cc: Jacob Klosinski, City of South Bend <br />File <br />INDUSTRIAL • MUNICIPAL CONTRACTOR <br />521 W. 84th Drive •Merrillville, IN 46410.219-9474700 + Fax 219-947-4711 <br />17219 Foundation Pkwy . Westfield, IN 46074 . 317-867-3462 • Fax 317-867-3463 <br />