Laserfiche WebLink
FYI... St. Joseph Energy Center's permit includes the following requirements found within the discharge permit. <br />1) St. Joseph Energy Center shall report flow daily. <br />2) St. Joseph Energy Center's Authorized Representative shall sign all reports including but not limited to Periodic <br />Compliance Reports (PCR), Slug Control Plans, Flow Measurement Plans, and corrective actions in response to <br />permit violations. <br />3) St. Joseph Energy Center shall, within 90 days of receipt of this discharge permit, submit a Slug Control Plan and <br />a Flow Measurement Plan. Please see Part III (E) and (H). <br />4) When collecting composite samples, samples must be obtained over a 24 hour period or for the duration of <br />discharge within the 24 hour sampling period including, if applicable, multiple batches. <br />5) Samples shall be obtained through a flow -proportional sampling technique. If St. Joseph Energy Center can <br />demonstrate that time -proportional sampling is as representative as flow -proportional sampling, then a time - <br />proportional sample may be collected. If St. Joseph Energy Center chooses to demonstrate that time -proportional <br />sampling is accurate they must do so within 120 days of the effective date of this permit or they shall commence <br />flow -proportional sampling at that time. Please see Part II (B) (1) of your wastewater discharge permit for details. <br />6) St. Joseph Energy Center shall have a Certified Operator for the State of Indiana sign all compliance reports <br />including, but not limited to PCR's, Corrective Action responses related to effluent limits violations.... See Part <br />III (F) (1). <br />7) To be submitted with the PCR, the Certified Operator shall sign one of the following statements: "Pretreatment <br />Standards and Requirements are being met on a consistent basis" or "Pretreatment Standards and Requirements <br />are not being met on a consistent basis. Additional operation and/or additional pretreatment is required to meet <br />the Pretreatment Standards and Requirements". Please see PART III (A) (3) (a). <br />8) Only the Authorized Representative shall be required to sign the certification statements found in Part III (A) (4) <br />of this permit. <br />9) Please review Section Part IV (B) (15), which clarifies the requirements concerning the Authorized <br />Representative. <br />10) For all after hours required oral notifications call: 574-277-8515 and dial zero (0) to reach an operator. See Part <br />III (I) of your permit for details. <br />If you have any questions, feel free to contact Manuel "Manny" Bueno at (574) - 235-5798 or <br />mbueno@southbendin.gov or Lauren Trapp at (574) 235-5852 or Itrapp@southbendin.gov. <br />