Laserfiche WebLink
GIBSON-LEWIS, LLC CONTRACTORS <br />1001 West 111h Street # Mishawaka, IN 46544 *P.O. Box 488 P Mishawaka, IN 46546 <br />(574) 259-8581 ♦ (574) 258-0932 FAX <br />s 1— Floor Drain: J. R. Smith cast iron floor drain with 5" round brass top (in <br />utility room). <br />16, Furnish and install all applicable B-vent flue pipe for the relocated water and reconnect <br />to the existing flue. <br />17. Furnish and install one (1) ceiling mounted exhaust fan and connect to the existing <br />exhaust duct system in the men's locker room. Fan is 120V and is to be interlocked with <br />the lighting in the space by others. <br />18. Furnish and install two (2) supply air diffusers (1 for the restroom and 1 for the utility <br />room) and reconnect to the existing supply duct system. <br />19. Supply labor and materials to relocate Data box high on wall to accommodate new entry <br />wall and door opening. (Please note this will only move as far as the existing cables will <br />allow) <br />20. Supply labor and materials to relocate (1) 2x 4 fluorescent fixtures to center of storage <br />room. <br />21. Supply labor and materials to rework the lighting circuit to accommodate the new <br />fixture location. <br />22. Supply labor and materials to install (1) occupancy sensor light switch. <br />23. Supply labor and materials to install (1) double duplex convenience receptacle. <br />24. Supply labor and materials to relocate (1) 2x4 fluorescent fixtures to center of rest <br />room. <br />25. Supply labor and materials to rework the existing lighting circuit to accommodate the <br />new location. <br />26. Supply labor and materials to install (1) vanity light over mirror to operate off same <br />switch as fluorescent light fixture. <br />27. Supply labor and materials to install (1) occupancy sensor switch. <br />28. Supply labor and materials to install (1) GFI receptacle near sink utilizing local circuitry. <br />29. Supply labor and materials to install power to (1) exhaust fan. Supplied and installed by <br />EJ White utilizing the existing lighting circuit and controls. <br />30. Supply labor and materials to install (1) dedicated receptacle for toilet as required. <br />31. Supply labor and materials to install (1) data cable in wall that is outside of wall at the <br />present time. <br />32. Furnish and install new 2' x 2' ceiling tile. We have figured USG Radar 2220 tile in our <br />proposal. <br />33. Install wood blocking for toilet accessories. <br />34. Patch holes in walls after plumbing and electrical work is completed. <br />35. Furnish and install new VCT and vinyl base in both rooms. <br />36. Install ADA compliant vanity, grab bars, and mirror. <br />37. Paint walls and door frames (new wood door to come prefinished). <br />38. All cleanup associated with our work. <br />All for the sum of .....................$23,159.00 <br />A NATIONAL CONSTRUCTION ENTERPRISES COMPANY <br />