REGULAR MEETING APRIL 25, 2017 119 <br />be accepted and the quotation be awarded as outlined above. Ms. Dorau seconded the motion, <br />which carried. <br />AWARD QUOTATION — 2017 TREE AND STUMP REMOVAL — PROJECT NO 117-009 <br />MVH <br />Mr. Kevin Fink, Engineering, advised the Board that on April 11, 2017, quotations were received <br />and opened for the above referenced project. After reviewing those quotations, Mr. Fink <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />K&R Tree Service LLC, 1724 S Grant Street, South Bend, IN, in unit prices not to exceed <br />$39,619.47. Therefore, Ms. Maradik made a motion that the recommendation be accepted and <br />the quotation be awarded as outlined above. Ms. Dorau seconded the motion, which carried. <br />AWARD QUOTATION — NORFOLK SOUTHERN AND CANADIAN NATIONAL <br />RAILROAD CROSSINGS AND QUIET ZONES MATERIALS — PROJECT NO 116 110 <br />LOIT <br />Ms. Tara Weigand, Engineering, advised the Board that on April 11, 2017, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Wiegand found that neither bidder submitted two (2) required letters confirming the compression <br />strength and impact strength of the materials, required by the specifications. She stated Legal <br />recommended she call them and request the letters if the company received them. When <br />contacted, both bidders had the letters and submitted them immediately. Ms. Wiegand noted she <br />then found that the low bidder did not bid on what was requested in the specifications and were <br />therefore found non -responsive to the bid, so she is therefore recommending that the Board <br />award the contract to the lowest responsive and responsible bidder, MGI Traffic Control <br />Products, Inc., PO Box 421, Fairland, Indiana 46126, in unit prices not to exceed $45,966.40. <br />Therefore, Ms. Maradik made a motion that the recommendation be accepted and the quotation <br />be awarded as outlined above. Ms. Dorau seconded the motion, which carried. <br />REJECT QUOTATION — LEIGHTON PLAZA IMPROVEMENTS — PROJECT NO 117 054 <br />(SPECIAL DONATIONS) <br />In a memo to the Board, Allie Schultz, Engineering, requested the Board reject the sole quotation <br />received from Gibson -Lewis, LLC, for the above project. She noted the one (1) quote was <br />opened on April 20, 2017, and was over budget and exceeded the allowable 5% maximum of the <br />base bid for Mobilization and Demobilization per 2016 INDOT Specification Section 101 <br />requirements. Ms. Schultz noted the three (3) other contractors that quotes were requested from <br />did not submit quotes. Therefore, upon a motion by Ms. Maradik, seconded by Ms. Dorau and <br />carried, the quotation was rejected. <br />APPROVE CHANGE ORDER NO. 1 — CORBY BOULEVARD SIDEWALK <br />IMPROVEMENTS, DIVISIONS A B AND C — PROJECT NO 116-087 (MVH) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of Rieth-Riley Construction Co., Inc., 25200 State Road 23, South Bend, IN 46614, indicating <br />the contract amount be increased by $21,505.00 for a new contract sum, including this Change <br />Order, in the amount of $155,591.18. Upon a motion made by Ms. Maradik, seconded by Ms. <br />Dorau and carried, the Change Order was approved. <br />APPROVE SCRIVENER'S ERROR CORRECTION TO CHANGE ORDER NO. 2 — <br />IGNITION PARK INFRASTRUCTURE PHASE 1 C - PROJECT NO 114-063A (RWDA TIF) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted a supplement to Change Order <br />No. 2 on behalf of Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46614, indicating <br />the contract amount be increased by $7,000 for a new contract sum, including this Change Order, <br />in the amount of $4,277,077.38. Mr. Villa noted Change Order No. 2 was approved on April 14, <br />2015 in the amount of $94,500, but the correct amount was $101,500 so he needs to correct the <br />scrivener's error. Mr. Villa stated the subsequent Change Orders were based on the correct <br />amount of $101,500, but the scrivener's error was just recently discovered when he went to close <br />the project out. Mr. Villa added he needs to correct this error before he can close out the project. <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the Change Order <br />was approved. <br />APPROVE CHANGE ORDER NO. 8 — EAST BANK SEWER SEPARATION PHASE 5 — <br />PROJECT NO. 114-062B (REDA TIF) <br />