My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04252017 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2017
>
04252017 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:35:27 PM
Creation date
5/9/2017 2:30:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ll <br />REGULAR MEETING APRIL 25, 2017 114 <br />LINK ENVIRONMENTAL EQUIPMENT <br />918N.US35 <br />Winamac, IN 46996 <br />Bid was signed by: Terry O'Brien <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />BID: <br />Description Year/Make/Model Unit Price <br />Tub Grinder 2017 DuraTech - 310 $345,596.00 <br />Alternate # <br />Description <br />Cost <br />Total <br />1 <br />Two (2) 4" round 6x9 diamond <br />screens <br />$860.00 <br />$1720.00 <br />2 <br />Air Compressor <br />$6,600.00 <br />$6,600 <br />3 <br />Heavy Duty Belt — Stacking <br />$2,940.00 <br />$2,940.00 <br />4 <br />Cab and loader unit with all <br />necessary upgrades to unit <br />$79,150.00 <br />$79,150.00 <br />5 <br />Extended Warranty <br />$8,000.00 per <br />year <br />$16,000.00 <br />6 <br />Work Light Package <br />INCL. <br />*1-1 A T «T <br />%,r'� it n.A1 . w tinxAiN 1 Y a 10 — L Y RS — UP to 60mo. - $3,110.00 <br />*Estimated number of days for delivery from award date: 90-120 <br />COLUMBUS EQUIPMENT COMPANY <br />2323 Performance Way <br />Columbus, OH 43207 <br />Bid was signed by: Jesse Garber <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Security Check was submitted. <br />on <br />Description Year/Make/Model Unit Price <br />Tub Grinder 2017 Morbark 1100 $453,000.00 <br />Alternate # <br />Description <br />Cost <br />Total <br />1 <br />Two (2) 4" round 6x9 diamond <br />screens <br />$1,422.00 <br />$454,422.00 <br />2 <br />Air Compressor <br />$6,844.00 <br />$461,266.00 <br />3 <br />Heavy Duty Belt <br />4 <br />Cab and loader unit with all <br />necessary u grades to unit <br />$94,913.00 <br />$556,179.00 <br />5 <br />Extended Warranty <br />$6,100.00 <br />$562,279.00 <br />6 <br />Work Light Package <br />$2 287.00 <br />$564 566.00 <br />i»uiiiat.Cu uumucr ui uays tor aenvery trom award date: 90 days <br />VERMEER OF INDIANA <br />13402 Britton Park Road <br />Fishers, IN 46038 <br />Bid was signed by: Troy Gipson <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />
The URL can be used to link to this page
Your browser does not support the video tag.