Laserfiche WebLink
REGULAR MEETING APRIL 11, 2017 101 <br />WILLIS CONSTRUCTION <br />54300 Rose Road <br />South Bend, IN 46628 <br />Quotation was submitted by Joshua Willis <br />QUOTATION: $10,400.00 <br />JW CONCRETE & EXCAVATING <br />1617 Td Street <br />Osceola, IN 46561 <br />Quotation was submitted by Rodney Rouch <br />QUOTATION: $12,755.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and carried, the above quotations <br />were referred to Engineering and the Fire Department for review and recommendation_ After <br />reviewing those quotations, Mr. Kevin Fink, Engineering, informed the Board that TX Concrete <br />did not fill in unit prices, just totals for each line item. Mr. Fink stated he calculated the unit prices <br />based on quantity and totals and Mr. Jose Quijado, TX Concrete, confirmed over the phone that <br />his calculations were correct. Mr. Fink stated Willis construction made a multiplication error that, <br />when corrected, results in a $69 increase to the final total. He noted he confirmed this with Willis <br />Construction over the phone also. Mr. Fink stated the quote tabulation reflects the corrected final <br />amount, and the increase does not impact the quote order results. Therefore, Mr_ Fink <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />TX Concrete, in the amount of $8,545.13. Upon a motion by Ms. Maradik, seconded by Ms. <br />Fritzberg and carried, the recommendation was approved and the quotation was awarded as <br />outlined above. <br />OPENING OF QUOTATIONS — NORFOLK SOUTHERN AND CANADIAN NATIONAL <br />RAILROAD CROSSINGS AND QUIET ZONES MATERIALS— PROJECT NO. 116-110 <br />LOIT <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />IMPACT RECOVERY SYSTEMS, INC. <br />4955 Stout Drive <br />San Antonio, TX 78219 <br />Quotation was submitted by Carol Pollok <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted <br />QUOTATION: $42,298.63 <br />MGI TRAFFIC CONTROL PRODUCTS <br />PO Box 421 <br />Fairland, IN 46126 <br />Quotation was submitted by Mike Green <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted <br />QUOTATION: $45,966.40 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and carried, the above <br />Quotations were referred to Engineering for review and recommendation. <br />