My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04112017 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2017
>
04112017 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:35:46 PM
Creation date
4/26/2017 2:50:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING APRIL 11, 2017 100 <br />Alternate No. 1: $10,786.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and carried, the above bids were <br />referred to Venues, Parks, and Arts for review and recommendation. <br />OPENING OF QUOTATIONS — 2017 COLD MILLING — PROJECT NO. 117 051 (LRSA) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotations were opened and read: <br />WALSH & KELLY, INC. <br />24358 SR 23 <br />South Bend, IN 46614 <br />Quotation was submitted by Dustin Hilary <br />QUOTATION: $120,000.00 <br />J.L. MILLING, INC. <br />15262 Industrial Drive <br />Schoolcraft, MI 49087 <br />Quotation was submitted by Linda Schuring <br />QUOTATION: $62,200.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and carried, the above quotations <br />were referred to Engineering for review and recommendation. <br />OPENING OF QUOTATIONS — 2017 TREE AND STUMP REMOVAL — PROJECT NO. 117- <br />009 (MVH) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotations were opened and read: <br />KC TREE, INC. <br />- 1320 Third Street <br />Osceola, IN 46561 <br />Quotation was submitted by Kregg Keigley <br />QUOTATION: $40,200.00 <br />K & R TREE SERVICE LLC <br />1724 S Grant Street <br />South Bend, IN 46613 <br />Quotation was submitted by Kevin Kenney <br />QUOTATION: $39,619.47 <br />Attorney Schmidt stated K&R Tree Service LLC noted on their bid that one of the addresses listed <br />in the bid specs, 719 Edison Rd., does not exist and they believe it should be 729 Edison Rd. Upon <br />a motion made by Ms. Maradik, seconded by Ms. Fritzberg and carried, the above quotations were <br />referred to Engineering for review and recommendation. <br />OPENING AND AWARD OF QUOTATIONS — FIRE STATION TRAINING CENTER SITE <br />IMPROVEMENTS — PROJECT NO. 117-013 REPAIRS/MAINTENANCE <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotations were opened and read: <br />TX CONCRETE <br />24899 Filhnore Road <br />South Bend, IN 46619 <br />Quotation was submitted by Jose Quijado <br />QUOTATION: $8,545.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.