Laserfiche WebLink
Contractor's Bid for Public Work - City of South Bend <br />Project No. 115-097 <br />Addendum No. 02 <br />April 2017 <br />111, <br />TESCO Combination Cabinet on Existing Foundation <br />1 <br />EACH <br />7,400.00 <br />$7,400.00 <br />112. <br />4-11c No. 4 Copper Cable <br />6,570 <br />LFT <br />6.00 <br />$39,420.00 <br />113, <br />2" PVC Schedule 80 for Lighting <br />5,790 <br />LFT <br />4.35 <br />$25,186.50 <br />114, <br />2" PVC Schedule 80 for Lighting, Directionally Drilled <br />475 <br />LFT <br />11.00 <br />$5,225.00 <br />115. <br />Light Pole Foundation <br />51 <br />EACH <br />686.00 <br />$34,935.00 <br />116. <br />Light Pole and Luminaire, LED, Type 1, Furnish <br />2 <br />EACH <br />4,811.00 <br />$9,622.00 <br />117. <br />Light Pole and Luminaire, LED, Type 2, Furnish <br />8 <br />EACH <br />7,410.00 <br />$59,280.00 <br />118. <br />Light Pole and Luminaire, LED, Type 1, Furnish and Install <br />40 <br />EACH <br />4,985.00 <br />$199,400.00 <br />119. <br />Light Pole and Luminaire, LED, Type 2, Furnish and Install <br />11 <br />EACH <br />7,710.00 <br />$84,810.00 <br />120. <br />Lighting Handhole <br />2 <br />EACH <br />654.00 <br />$1,308.00 <br />121. <br />Miscellaneous Equipment for Lighting <br />1 <br />LS <br />621,00 <br />$621.00 <br />122. <br />Drilled Shaft Foundation Type B <br />1 <br />EACH <br />6,800.00 <br />$6.800.00 <br />123. <br />Signal Cantilever Structure and Mast Arm 35% Install <br />1 <br />EACH <br />1,700.00 <br />$1,700.00 <br />124. <br />Traffic Signal Head, 3 Section, 12 IN <br />1 <br />EACH <br />600,00 <br />$600.00 <br />125, <br />Traffic Signal Head, 3 Section, 12 IN, Relocate <br />1 <br />EACH <br />145,00 <br />$145.00 <br />126. <br />Traffic Signal Head, 5 Section, 12 IN, Relocate <br />1 <br />EACH <br />267.00 <br />$267.00 <br />127. <br />Traffic Signal Handhole <br />1 <br />EACH <br />654.00 <br />$654,00 <br />128. <br />Signal Wire, 5c114 <br />425 <br />LFT <br />1.00 <br />$425.00 <br />129. <br />Signal Wire, 7cl14 <br />235 <br />LFT <br />1.25 <br />$293.75 <br />130. <br />2" PVC Schedule 80 for Signal Wiring, Directionally Drilled <br />180 <br />LFT <br />11.00 <br />$1.980.00 <br />131. <br />Painting Traffic Signal Equipment <br />1 <br />EACH <br />750.00 <br />$750,00 <br />132. <br />Sheet Sign, 0.080 in. <br />1 <br />EACH <br />17.75 <br />$17.75 <br />133. <br />Tree, Greenspire Linden, 2.5" <br />1 <br />EACH <br />450.01 <br />$450.01 <br />134. <br />Sign Post, Square, Type 2, Reinforced Anchor Base <br />70 <br />LFT <br />11,85 <br />$829.50 <br />136. <br />Pavemet Markings, Remove <br />700 <br />LFT <br />0.56 <br />$392.00 <br />136. <br />Line, Epoxy, Solid, White, 4" <br />340 <br />LFT <br />1.00 <br />$340.00 <br />137. <br />Line, Epoxy, Solid, Yellow, 4" <br />3,460 <br />LFT <br />1.00 <br />$3,460.00 <br />138, <br />Line, Epoxy, Solid, White, 6" <br />930 <br />LFT <br />3.00 <br />$2,790.00 <br />139, <br />Line, Epoxy, Broken, Yellow, 4" <br />422 <br />LFT <br />1,00 <br />$422.00 <br />140. <br />Transverse Line, Preformed Plastic, White, 24", Stop Bar <br />166 <br />LFT <br />12,00 <br />$1,992.00 <br />141. <br />Pavement Message Marking, Preformed Plastic, Lane <br />Indication Arrow <br />11 <br />EACH <br />175.00 <br />$1,925,00 <br />142. <br />Pavement Message Marking, Preformed Plastic, Sharrow <br />6 <br />EACH <br />350.00 <br />$2,100.00 <br />143, <br />HMA for Patching <br />140 <br />TON <br />110.00 <br />$15,400.00 <br />144. <br />PCCP, 4" Overlay <br />4,300 <br />SYD <br />38.75 <br />$166,625.00 <br />145, <br />Inserta Valve, 6" <br />1 <br />EACH <br />8,600.00 <br />$8,600.00 <br />Total Amount of Base Bid (Items 1 through 145) <br />$2,785,903.23 <br />Bidder's Name: tr�' <br />Version 7-3112015 _'�?/1f� Gontractar's Bid For Public Works-1 l C._ <br />